Laserfiche WebLink
COST ESTIMATE:GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> Nov et ib`er 22.2016 HWA GeoSciences Inc. HWA <br /> GRAND AVENUE PARK BRIDGE- Principal PrincipalGeotech. Geotech. <br /> Hydrogeologist Geotech. Geologist <br /> IX VIII Engineer VI Engineer EngineerI V Clerical <br /> CONSTRUCTION MANAGEMENT&CSS VI III MULTIPUIR <br /> Item I SCOPE OF WORK $82.93 I $74.04 I $52.98 I $40.00 $37.02 I $32.69 I $32.69 1 $21-25 3.1840 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 I 0 I 0 I 0 I 0 I 0 I 0 I 0 $0 <br /> ly- ___t . r a ., .. ..,.,,- $sat- A_ • -.b_• e. <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 I 0 I 0 J 0 L 0 I 0 L0 L_ 0 $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> 3.10 Geotechnical Construction Engineering - - - <br /> 3.11 Preconstruction Meeting 8 0 0 $1,010 <br /> 3.12 Geotechnical Submittal Review 8 16 8 $4,066 <br /> 3.13 Geotechnical Construction Engineering(as needed) 10 20 20 $8,365 <br /> 3.14 Dewatering Rate Analysis 4 8 24 $5,347 <br /> 3.15 Geotechnical Railroad Coordination(as needed) 8 8 $2,366 <br /> 3.20 Geotechnical Observation and Associated Field Engineering <br /> 3.21 Utility Excavation&Shoring-East Abutment(5 days) 5 10 2D $4,102 <br /> 3.22 Installation of Drilled Shafts-East Abutment(6 days) 6 12 24 $4,923 <br /> 3.23 Installation of Slope Protedlon System(10 days) 10 20 4 36 $8,205 <br /> 3.24 Sheetpile Installation-West Abutment(5 days) 15 10 20 $5,765 <br /> 325 Installation of Drilled Shafts-West Abutment(8 days) 8 12 32 $8,092 <br /> 328 Utility Excavation&Shoring-WestAbutment(5 days) 8 10 20 $4,607 <br /> 327 Construction Meetings(assume 10 meetings) 40 $6,735 <br /> 3.30 Project Management <br /> 3.31 QA,Budget Tracking,Communications,Scheduling,Billing 8 32 32 $7,284 <br /> Labor Subtotal: 10 I 4 I 150 I- 32 I 142 I 128 I 36 I 32 $68,887 <br /> .. -.. .- . 4�., _ - 5 <br /> ��. ,.•,._�x--, �•tger...ni.:les ��i $1,29 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 I 0 1 0 I 0 I 0 1 0 I 0-w 0 $0 <br /> I -,• ,_.. -----x• -�_'i '21-11:21-j__ �_ ,: <br />