Laserfiche WebLink
EXHIBIT A <br /> KPFF Consulting Engineers <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - EXTRA WORK SUPPLEMENT#2 <br /> Classification Total Hours X Rate = Cost <br /> Principal 4.00 X $62.50 = $250.00 <br /> Project Manager 704.87 X $54.60 = $38,485.63 <br /> Senior Engineer 567.24 X $45.00 = $25,525.80 <br /> Design Engineer 383.10 X $35.77 = $13,703.49 <br /> CADD Technician 453.08 X $39.23 = $17,774.33 <br /> Project Coordinator 202.00 X $28.85 = $5,827.70 <br /> Administrative 0.00 X $20.00 = $0.00 <br /> 0.00 X = $0.00 <br /> 0.00 X = $0.00 <br /> DSC Subtotal $101,566.94 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 136.59%' X $101,566.94 = $138,730.29 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $101,566.94 = $30,470.08 <br /> Total KPFF Labor Cost $270,767.32 <br /> Reimbursables <br /> Mileage (## Miles x $0.545/mile) <br /> Reprographics (## Sheets x$X.xx/sheet) <br /> Subcontract (Sub Name & Task) <br /> (Blank) (Allowance) <br /> Subtotal $0.00 <br /> Subconsuitant Costs (See Exhibit G) $17,148.59 <br /> GRAND TOTAL $287,915.91 <br /> 3 <br />