9 <br /> 11/16/2016 <br /> COST ESTIMATE: GRAND AVENUE PARK BRIDGE-EXTRA WORK SUPPLEMENT#2 <br /> November 16,2016 KPFF Consulting Engineers KPFF Combined <br /> GRAND AVENUE PARK BRIDGE-EXTRAProject Senior Design CAM Project Administr <br /> WORK SUPPLEMENT#2 <br /> Principal Manager Engineer Engineer Tee hrnicia Cooniinat a8ve 00000 00000 <br /> or <br /> MULTIPLIER: <br /> Item I SCOPE OF WORK $62.50 I $54.60 I $45.00 I $35.77 I $39.23 I $28.65 I $20.00 I $0.00 I 50.00 2.6659 <br /> 1 PRQJECT MANAGEMENT <br /> 1.10 Managment of Phase 2 173.2 60 <br /> 1 $29,825 <br /> 1.20 Issues Related to Project Including Water Quality 40 $5,822 <br /> 1.30 Add'l PUD Efforts 24 $3,493 <br /> 1.40 Add'I Port Efforts 24 $3,493 <br /> 1.50 Add'l Paint,HDG,and Weathering Steel Investigations& 32 $4,658 <br /> 1.60 Extension of Management Process Through Aug 2016 173.2 $25,211 <br /> 1.70 Extra Effort Learning COE CAD Set Manager&Requirements 40 $4,183 <br /> 1.80 Supplement 2 and 3 Development 30 24 $6,213 <br /> I I - . <br /> Labor Subtotal 0 I 4964 I 0 I 0 I 40 1 84 I 0 I 0 I 0 $82,899 <br /> ...ti. - - ,,, <br /> 2 GEOTECHNICAL ENGINEERING <br /> 2.10 Extra Work-Slope Stability Evaluatons 4 $582 <br /> 2.20 Extra Work-Ground Water Monitoring 4 $582 <br /> 2.30 Extra Work-Additional Plan and Spec Review 4 $582 <br /> Labor Subtotal: 0 I 12 I 0 I 0 I 0 I 0 I 0 1 0 0 $1,747 <br /> $ 6 ii <br /> 3 STRUCTURAL ENGINEERING <br /> 3.10 Redesign of Truss From 20'to 16'Wide 32 24 80 40 $19,349 <br /> 3.20 Development of Division 1 Specifications for Phases 1&2 150 50 $21,840 <br /> 3.30 Revising Specs and updating per WSDOTAugust 2016 revisions 80 20 $8,736 <br /> 3.40 Assistance to COE Through Award 45 121 303 329 $84,462 <br /> 3.50 Coordination of Phase 2 Spec Final Package 60 20 12 32 . $14,849 <br /> 80 16 $10,828 <br /> S ,pia �'k. Labor Subtotal: 0 I 137 I 455 I 383 I 381 I 118 I 0 I 0 0 $160,084 <br /> ISt,70/0424Stilt4 .�s vim.„:Yny,T`xi l .k' hill 1: < _- $0 <br /> 4 CIVIL ENGINEERING <br /> 4.10 IPSO3 Connection to collect street drainage 4 $582 <br /> Meeting Attendance&Coordination with CoE 4 4 $1,062 <br /> Revise design layout and detailing 4 24 8 $4,298 <br /> Research backflowvalve sytems 2 $240 <br /> Update Specs,Cost Estimate and SD report 6 $950 <br /> 420 CS piping Revisions to Accommodate PND designs 4 $582 <br /> Update X-refs and Resolve Utility Conflicts 4 4 - $898 - <br /> Revise Profiles to new pipe locations 4 24 8 $4,298 <br /> 4.30 Revise SSFM Connection to LS7 bypass port 4 $582 <br /> Update Plan,Profile and details 2 16 4 $2,629 <br /> 4.40 Electrical Vaults and Conduits©Park&WMVD 1 $146 <br /> Coordination with CoE&Electrical Designer 6 2 $1,113 <br /> Revise design layout and detailing 4 24 8 $4,298 <br /> Update Specs&Cost Estimate 2 4 5771 <br /> 4.50 QC Review 4 4 $1,249 <br /> I <br /> Labor Subtotal:) 4 I 43 I 112 I 0 I 32 I 0 I 0 I 0 I 0 $23,708 <br /> 5 ENVIRONMENTAL&PERMITTING <br /> 5.10 Extra Work-Water Quality Related:Research,dilution analysis, 4 $582 <br /> meetings,communications <br /> 5.20 Extra Work-Related to Project Spec's related to:permits, 4 $582 <br /> hazardours and contaminated materials,const cost est <br /> - LaborSubtotal: 0 1 8 1 0 I 0 I 0 I 0 I 0 I 0 I 0 $1,164 <br /> -C-lni_ f JiMi .. --- -- ---- - - - .. _.._ .. _ $0 <br /> 6 ELECTRICAL ENGINEERING <br /> 6.10 Extra Work-Re-design of Park Lighting 4 I $582 <br /> 6.20 Extra Work-New design for 4"conduits 4 $582 <br /> 1 <br /> LaborSubtotal: 0 I 8 1 6 I 0 I 0 I 0 I 0 I 0 I 0 $1,164 <br /> ❑. e rF.'72^' --------- -- -.__. -. .- ----'- $0 <br /> I <br /> Labor Sum: 4 1704.871 567.241 383.1 1453.081 202 I 0 I 0 I 0 $270,767 <br /> Reimbursable Sum: $0 <br /> 4 IKPEC=Combined SUBTOTAL: $270,167 <br />