Laserfiche WebLink
5 <br /> Exhibit B-2 <br /> Addendum to Compensation <br /> South Effluent Pump Station & Crosstown Pipeline <br /> Everett, Washington <br /> Task Budget <br /> Task 5. Final Design Modifications <br /> 5.1 Evaluation of Electrical Equipment Enclosures $4,100 <br /> 5.2 Evaluation of Installing Pumps in CCC $6,300 <br /> 5.3 Evaluation of Grand Ave & 26th St Alignment $1,900 <br /> 5.4 Evaluation of Capacity of River Diffuser $1,600 <br /> 5.5 Design of Manhole Repair $3,000 <br /> 5.6 Evaluation of Pipeline Alignment along Everett Ave. $34,300 <br /> 5.7 Prepare Revised 30% Pump Station Documents $33,300 <br /> TOTAL AMOUNT $84,500 <br /> THE METHOD OF PAYMENT WILL BE LUMP SUM TOTALING $84,500. Amount invoiced each <br /> month will be based on estimate of percentage of completion multiplied times the lump sum <br /> amount. <br /> 22 <br /> C:\Documents and Settings\tmarks\Local Settings\Temporary Internet files\OLK9\Exhibit B-2 Revised Sept 20.doc <br />