Laserfiche WebLink
• <br /> J <br /> contacted and asked for a recommended product for coating of the CCC walls. CH2M <br /> HILL's coating specialist will review Sherwin William's recommendation and provide <br /> comments. <br /> Reports and Documents to be Revised. The permit drawings and project description will <br /> be revised to show the new pump station layout.The Geotechnical Design Recommendation <br /> Technical Memoranda will be revised to include a discussion of the CCC structure and <br /> pump station. <br /> Subtask 5.7 Deliverables. The deliverables for Subtask 5.7 will include the following: <br /> • Report regarding structural evaluation of Chlorine Contact Channel (1 copy) <br /> • Drawings describing the pump station at the 30 percent level of design <br /> • Meeting notes from informal review meeting with City staff <br /> • Recommendations for applying a coating to the interior of the CCC <br /> • Revised permit drawings showing the pumps installed in the CCC (1 copy) <br /> • Revised project description for permit applications (1 copy) <br /> • Revised Geotechnical Design Recommendation Technical Memoranda (1 copy) <br /> 21 <br /> 5 OF 5 <br />