My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/02/26 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/02/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 9:43:00 AM
Creation date
1/6/2017 9:42:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> BMP 3(b): Correction of Illicit Discharges from Commercial and Industrial Sites <br /> mra = i2aF �, a ,w� Yn d ' <br /> art ofta ead ng r. gr m?_ <br /> 0 Yes/® No " deo lte en, t to olved�i B p em'n t ., 0 Yes/® No <br /> 1 ,- <br /> ;-� r «y ",9 1 h: ,- n!s.+: tea+ <br /> Measurable Goal: Illicit discharges with the potential to pollute surface water found during inspections shall <br /> be provided a notice to disconnect from the MS4 within 5 days of inspection. Corrective <br /> action will generally be required within 60 days of the notice to disconnect. <br /> Milestones: After completion of initial round of inspections, evaluate appropriate changes that could <br /> improve efficiency. <br /> BMP 3(c): Public Notification <br /> t his' si tof an existing irogram').a Yes I® No Is another entitymyolved in BMP implementati it ❑Yes/® No <br /> trqe-t <br /> Measurable Goal: Notify DOE of any discovered illicit discharge within 5 business days of its detection. <br /> Milestones: Evaluate public notification record upon completion of initial round of inspections. <br /> 4. Construction Site Run-off Control <br /> Intbe following spaces,indicate if your MS4 presently performs these activities related to construction sife'runoff:on ro: <br /> Activities: Existing? <br /> Construction site plan review ®Yes/❑No <br /> Responding to public input and complaints ®Yes/❑No <br /> Enforcement and inspection procedures ®Yes/0 No <br /> Training and education 0 Yes/®No <br /> Minimum Measure Minimize the runoff of sediment and other pollutants from construction sites larger than or <br /> Objective 4: equal to 1 acre. <br /> BMP 4(a): Erosion, Sediment and Source Control Plans <br /> Oth, p rgf an em ting p gm., ®Yes/0 No i Is another entity involved in BMP impl <br /> �attn- - ❑Yes/ ®No <br /> Measurable Goal: As required by an existing surface water system ordinance, each construction site greater <br /> than or equal to one acre shall be required to submit and obtain City of Everett approval of <br /> an erosion, sediment and source control plan. Each plan shall include BMPs designed to <br /> minimize the discharge of sediment and other pollutant sources during construction. <br /> Milestones: Erosion, sediment and source plan approval should occur prior to or concurrent with grading <br /> permit issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.