My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/02/26 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/02/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 9:43:00 AM
Creation date
1/6/2017 9:42:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> BMP 4(b): Enforce existing surface water ordinance that requires erosion, sediment and source controls <br /> _ at construction sites. <br /> Ts& %i'Fi' k'Y-=-�X� �'h ..a'gT. ?�' : a''a� +st''�,.' �2, ��A3-�,r t1�, +�,.-, � r d �rP���`�.r- � rY,Mi�3" <br /> thi pa t of an tai- rogram./" ®Yes/0 No FIs another enhtm evolved m,BMP unpleme tion? ❑ <br /> -. '�' -ez �,.r}f£_•,- -'+. „•-rr�a+Peri' F.,-.n.n . 3±- Yes/ NO <br /> Measurable Goal: Each construction site greater than or equal to one acre shall be inspected for compliance <br /> with their approved erosion, sediment and source control plan at least once per week for <br /> projects not actively under construction during the rainy season. For projects actively under <br /> construction, an inspection will be made at least three times per week during the rainy <br /> season. <br /> Milestones: Inspection of erosion and sediment control facilities should occur prior to the onset of the <br /> rainy season (October 1). <br /> BMP 4(c): Enforce existing city small parcel standards (less than one acre) for those parcels that are <br /> part of a larger common plan of development. <br /> .r, F' s:T 9-ofc F i �.s x•_:. Y,� y, ; ..,�J T r.n ,-art' w x- _. <br /> thisgpart of an existing program?.` ®Yes/❑No =Is another enhtyulvolved in BMP`im, pementaton? 0 Yes/®No <br /> Measurable Goal: Each single family residential lot within a subdivision of greater than one acre shall receive <br /> an initial inspection to review the need for erosion and sediment control. <br /> Milestones: Based upon the initial inspection, erosion and sediment control requirements should be <br /> included in the construction plan for those small parcels with a significant risk of erosion. <br /> 5. Post-Construction Storm Water Management in New Development and Redevelopment <br /> Please answer the foIlowing questions regarding`post'construction storm wr ate_ management m new development ander t <br /> redeyelopment:- - <br /> Does your MS4 presently have a development permit process in place? ®Yes/0 No <br /> Does your MS4 presently have a storm water management technical manual? ®Yes/0 No <br /> If yes,has the MS4 adopted the Ecology 2001 Storm water manual,or an equivalent manual? 0 Yes/ No <br /> Does your MS4 presently have a plan review process for new development and redevelopment? ®Yes/0 No <br /> Does your MS4 presently inspect new or existing storm water facilities? ®Yes/❑No <br /> Does your MS4 presently have a storm water ordinance?(If yes,code number- ) ®Yes/0 No <br /> Does your MS4 presently promote and/or provide incentives for Low Impact Development? 0 Yes/®No <br /> Does your MS4 presently have a web site? (If yes,list address ) ®Yes/0 No <br /> Minimum Measure Minimize the water quality impacts of new development and redevelopment during the <br /> Objective 5: post-construction phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.