Laserfiche WebLink
4.0 Modification to Design of the Recommended Alternative <br /> Work Element 4.1. Based on comments from WSDOT of the draft Access Point <br /> Decision Report, modifications will be made to the design of the recommended <br /> alternative. <br /> Work Element 4.2. Based on comments from FHWA on the second round draft Access <br /> Point Decision Report, modifications will be made to the recommended alternative. <br /> 5.0 Preparation of the Final Access Point Decision Report Document <br /> Completion of the review process for the Access Point Decision Report will take place in <br /> two parts. First, WSDOT will be the reviewing agency. Once their review is completed, <br /> the access point decision report (final draft is forwarded to FHWA for review. FHWA <br /> may request modifications to the report prior to their decision. <br /> The purpose of this task is to prepare a second round draft and final Access Point <br /> Decision Report. It is expected that, after comments are received from WSDOT on the <br /> first draft, a second draft will be submitted to WSDOT for approval. WSDOT will then <br /> forward the second draft to FHWA for review. It is assumed that FHWA will have <br /> comments on the second draft and that some modifications will be required before <br /> submittal of a final Access Point Decision Report. <br /> Work Element 5.1. Respond to comments from WSDOT and prepare revisions to the <br /> draft report. It is expected that two iterations of review will be necessary to respond to all <br /> reviewers' comments. This work element has the following sub-elements: <br /> 5.1.1. Meet with the City and Project Support Team to discuss the draft report and <br /> obtain comments. <br /> 5.1.2. Revise the draft report and resubmit to the City and Support Team. <br /> 5.1.3. Provide City with 20 copies of the second round draft Access Point <br /> Decision Report. <br /> Work Element 5.2. Modify the second round draft Access Point Decision Report, <br /> incorporating comments made by FHWA. Incorporate changes in project design, and <br /> operational and accident analyses requested by FHWA. Prepare a third draft Access <br /> Point Decision Report that incorporates WSDOT comments for review by FHWA. <br /> FHWA may require additional modifications prior to approval of a final Access Point <br /> Decision Report. Twenty copies of the draft and final reports will be provided to the <br /> City. <br />