Laserfiche WebLink
Apr <br /> 3 STATE OF WASHINGTON ' <br /> DEPARTMENT OF NATURAL RESOURCES <br /> DOUG SUTHERLAND, Commissioner of Public Lands <br /> AQUATIC LANDS OUTFALL EASEMENT NO. 51-072799 <br /> TABLE OF CONTENTS <br /> 1. GRANT AND LOCATION OF EASEMENT 3 <br /> 1.1 Easement Property 3 <br /> 1.2 Rights of Third Parties 3 <br /> 1.3 Inspection 3 <br /> 1.4 Surveys Maps and Plans 3 <br /> 2. USE OF EASEMENT 4 <br /> 2.1 Permitted Use 4 <br /> 2.2 Restrictions on Use 4 <br /> 2.3 Conformance with Laws 4 <br /> 2.4 Liens and Encumbrances 4 <br /> 2.5 Modification upon Change of Permit Status 4 <br /> 3. TERM 5 <br /> 3.1 Term Defined 5 <br /> 3.2 Renewal of the Easement 5 <br /> 3.3 Development of Disposal Alternatives 5 <br /> 3.4 Delay in Delivery of Possession 6 <br /> 3.5 End of Term 6 <br /> 4. USE FEE 6 <br /> 4.1 Fee 6 <br /> 4.2 Payment Place 6 <br /> 4.3 Late Charges and Interest 6 <br /> 4.4 No Accord and Satisfaction 7 <br /> 4.5 No Counterclaim, Setoff, or Abatement of Use Fee 7 <br /> 5. COORDINATION OF ACTIVITIES 7 <br /> 6. MAINTENANCE AND REPAIR OF EASEMENT AND IMPROVEMENTS 7 <br /> 7. INTERFERENCE WITH OTHER USES OF EASEMENT PROPERTY 8 <br /> 8. ENVIRONMENTAL LIABILITY/RISK ALLOCATION 8 <br /> 8.1 Definition. 8 <br /> 8.2 Use of Hazardous Substances. 8 <br /> 8.3 Current Conditions,Duty of Utmost Care,and Duty to Investigate. 8 <br /> 8.4 Notification and Reporting. 9 <br /> 8.5 Indemnification and Burden of Proof. 10 <br /> 8.6 Cleanup. 11 <br /> 8.7 Sampling. 11 <br /> 8.8 Sediment Investigation. 12 <br /> 8.9 Reservation of Rights 13 <br /> October 14,2002 Page 1 of 27 Outfall Easement <br /> 5 <br />