My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/03/26 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/03/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 11:01:30 AM
Creation date
1/6/2017 11:01:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OrETT <br /> CITY OF EVERETT <br /> PROFESSIONAL SERVICES AGREEMENT <br /> THIS AGREEMENT made and entered into on this day of ,2003,by and between the <br /> CITY OF EVERETT,a municipal corporation under the laws of the State of Washington,hereinafter <br /> referred to as the "City," and R.W.Beck,Inc.,whose address is 1001 Fourth Avenue, Suite 2500, Seattle, <br /> Washington,hereinafter referred to as the"Contractor." <br /> WHEREAS,the City desires to engage the Contractor to perform an pre-design study of condition, <br /> capacity,and operations at the Evergreen Way Pump Station and related facilities for the City of Everett; <br /> and <br /> WHEREAS, Contractor represented, and by entering into this Agreement now represents,that it is fully <br /> qualified to perform the work to be performed hereunder in a competent and professional manner; <br /> NOW,THEREFORE,the parties herein do mutually agree as follows: <br /> 1. Engagement of Contractor. The City hereby agrees to engage the Contractor,and the <br /> Contractor hereby agrees,to perform the work in a competent and professional manner and provide the <br /> services described in the attached "Exhibit A-Scope of Work". The Scope of Work so identified is <br /> hereafter referred to as"Work". Without a written directive of an authorized representative of the City, <br /> the Contractor shall not perform any services that are in addition to, or beyond the scope of,the Work.If <br /> the Contractor's proposal is attached as an exhibit,and if such proposal contains or incorporates any <br /> conditions or terms in addition to or different from the terms of this Agreement,then the Contractor <br /> expressly agrees that such conditions or terms are neither incorporated nor included into this Agreement <br /> between the City and Contractor. Such design shall be reasonably accurate, adequate and suitable for its <br /> intended purpose. <br /> 2. Intellectual Property Rights. Reports,drawings,plans, specifications and any other intangible <br /> property created in furtherance of the Work are property of the City for all purposes,whether the project <br /> for which they are made is executed or not, and may be used by the City for any purpose. Unless <br /> otherwise expressly agreed in writing, all intellectual property rights in such documents or intangible <br /> property created pursuant to this Agreement,or for the City of Everett,belong to the City of Everett. <br /> Contractor retains any intellectual property rights in documents and intangible property created by <br /> Contractor prior to engagement,or not created by Contractor for its performance of this Agreement. <br /> 3. Time of Beginning and Completion of Performance. This Agreement shall commence as of the <br /> date of execution of this Agreement and shall be completed by September 30,2003. <br /> 4. Compensation. <br /> A. The City shall pay the Contractor only for completed Work and for services actually rendered <br /> which are described herein. Such payment shall be full compensation for Work performed or services <br /> rendered, including,but not limited to, all labor,materials, supplies, equipment and incidentals necessary <br /> to complete the Work. <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.