Laserfiche WebLink
Exhibit A <br /> f <br /> • Construction Staging Considerations <br /> • Cost Estimates (Capital and 0 &M) <br /> Chapter 4 AWWD Improvements (May not be needed, depending on <br /> findings of Task 2.6) <br /> Chapter 5 Standby Power Improvements <br /> • Risk Assessment <br /> • Summary of Alternatives <br /> ■ Selected Alternative <br /> o Mechanical <br /> o Electrical <br /> o Structural <br /> • Operations Considerations <br /> • Construction Staging Considerations <br /> ■ Cost Estimates(Capital and 0&M) <br /> Chapter 6 Implementation <br /> • Community Outreach <br /> ■ SEPA Considerations <br /> o Permits <br /> o EWPS <br /> ■ Standby Power Facilities <br /> • Schedule <br /> Deliverables <br /> 10 copies each of the draft and final Facility Plan. <br /> PDF of the final Facility Plan. <br /> Meetings <br /> Three meetings with the City and/or AWWD. <br /> 6 0 ,A Phase I Scope(2/28/03) <br />