My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/03/26 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/03/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 11:01:30 AM
Creation date
1/6/2017 11:01:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Combined Sewer Improvement"D" <br /> Change Order no. <br /> Change Order Effective Date: 2/24/03 <br /> Exhibit A—Description of Changed Work <br /> Repair of Existing Sewer Main <br /> • Clear Area <br /> • Excavate to a depth of approximately 13 feet <br /> • Repair 14 feet of broken concrete sewer line with ductile iron pipe <br /> • Slipline 130 feet of 6" HDPE pipe from the "uphill" manhole to the <br /> "downhill" manhole <br /> • Backfill excavated area with gravel borrow <br /> • Restore homeowners' landscape to include steps, plants and gravel <br /> driveway <br /> • Perform general clean-up <br /> Exhibit B–Justification <br /> The City Utility department had an emergency situation at 4910 23`d Ave. at which an 8" <br /> concrete sewer line had separated between manholes. The broken sewer line was on a <br /> side slope. The City forces did not have the proper equipment to make the repair. <br /> The City requested the contractor perform the work on a force account basis. The total <br /> cost for the work is $ 27, 077.51. <br /> Exhibit A <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.