Laserfiche WebLink
-.�. �.-.... .... v. •aaaa irai �..i. vv Cvi1 :u pa"!. '.1...1 V1 i.♦Ca -JVVi! <br /> • <br /> Project: <br /> Change Order no. <br /> Change Order Effective Date: <br /> Exhibit A—Description of Changed Work <br /> Change order 41 is written as a bid item over and under run change order. All of the individual bid items <br /> are shown on the change order estimate sheets 1 through 3 of 3,EXHIBIT B. Refer to these sheets to <br /> verify a specific bid item over or under run amount Only those bid items whose quantity differences cause <br /> over and under run dollar amounts of$5,000.00 or more are being listed below. Additionally this change <br /> order 41 adds two new bid items(41 &42),to the contract. <br /> Work Order 3009 South 2"' Street—Franklin to Lenora,East Drive—Pecks to 58x'Street,Meridian <br /> Avenue—Everett Mall Way to 104°'Street Southeast_ <br /> L Amend the bid schedule by adding or deleting quantities to the bid items as shown on Exhibit B, work <br /> order 3009_ <br /> Item#4—Traffic Control Labor_ Delete hours of traffic control labor from the contract_ <br /> Item#9—Remove and dispose of existing pipe. Add linear feet of remove and dispose of existing pipe to <br /> the contract. <br /> Item#11—Roadway Excavation. Add cubic yards of roadway excavation to the contract. <br /> Item#16—Crushed Surfacing Base Course. Add tons of crushed surfacing base course to the contract. <br /> Item#20—Asphalt Concrete Drive_ Add tons of asphalt concrete drive to the contract <br /> Item#29—Ductile Iron Pipe for Storm Drain,12-Inch Diameter. Add linear feet of ductile iron pipe <br /> for storm drain, 12-inch diameter,to the contract. <br /> Item#32—Adjust Inlet/Catch Basin To Grade. Delete the number of inlets and catch basins requiring <br /> adjustment on the contract. <br /> Item#40—Force Account.—Reduce the amount of dollars set aside in the contract under this force <br /> account bid iters_ <br /> 2. Add the following two bid items to the contract as shown on Exhibit A_ <br /> Item#41—8-Inch and 12-Inch PVC Storm Sewer Pipe. Add a bid item to the contract for 8-inch and <br /> 12-inch PVC storm sewer pipe on a per linear foot basis_ <br /> Item#42—Concrete Inlet. Add a bid item to the contract for concrete inlet on a per each basis_ <br /> Work Order 3077—37th Street Improvements West of Rucker Avenue <br /> 3_Amend the bid schedule by adding or deleting quantities to the bid items as shown on Exhibit B, work <br /> order 3077. <br /> Item#4—Traffic Control Labor. Delete hours of traffic control labor from the contract <br /> JUSTIFICATION_ <br /> Item#4—Traffic Control Labor. The number of hours of traffic control labor estimated by the engineer <br /> were not used during construction on the project. <br /> Item#9—Remove and dispose of existing pipe_ Additional linear feet of remove and dispose of existing <br /> pipe were needed along South tad Avenue portion of the project as the existing storm drain system in that <br /> area was very shallow.Due to the shallow nature of the existing storm pipe it was damaged while <br /> excavating for sub-grade preparation for the new pedestrian pathway. The existing pipe was also over half <br /> filled with debris.The decision was made to remove the existing storm drain system along this two-block <br /> Exhiiit/A <br /> 4252578929 -> GRADE INC. ,TEL-1 360 668 6866 06/02'03 09:14 <br />