Laserfiche WebLink
4. What currentIfl41lppens to rainwater that falls on the site!raved surfaces for this project <br /> are collected and diriected to the existing detention pipe via catch basins and pipes.All of <br /> the downspouts from the roof are collected and directed to the existing detention pipe. <br /> 5. Please describe any critical areas on the site (wetlands, buffers,steep slopes,etc.)This <br /> information can be obtained from the City's GIS data,and is available at the permit <br /> counter. There are no critical areas on the site. <br /> 6. What types of soils are found on the site? <br /> **Note: to determine the type of soils on the site, please visit the Natural Resources <br /> Conservation Service's Web Soil Survey at http://websoilsurvey.nres.usda.qov/app/, click the <br /> green button that says Start WSS, then type in your address under Quick Navigation, create <br /> an Area of Interest(AO1)and click the second tab(Soil Map). The soil types will pop up with a <br /> hyperlink and the properties of each will be available when you click the hyperlink. <br /> The soil hydrologic types for this site have been identified as Type C from the Snohomish <br /> County Soil Survey Map.This soil,Alderwood—Urban Land Complex, is typically moderately <br /> deep and moderately drained soil found on till plains.This soil type is identified as a Till soil <br /> (Type C) in the 2005 DOE Manual. <br /> Page 2 of <br /> CITY OF EVERETT 13200 Cedar Street I Everett, WA 98201 1425-257-8810 I everettwa.gov <br />