My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 PAINE AVE WOOD MONSTERS 2018-12-20
>
Address Records
>
PAINE AVE
>
3326
>
WOOD MONSTERS
>
3326 PAINE AVE WOOD MONSTERS 2018-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 7:50:29 AM
Creation date
1/10/2017 9:49:06 AM
Metadata
Fields
Template:
Address Document
Street Name
PAINE AVE
Street Number
3326
Tenant Name
WOOD MONSTERS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Site Information: <br /> 1. How will your project change the existing conditions? <br /> The project will add 3,600 SF of roof and two downspouts that will be connected to the <br /> existing storm detention pipe. <br /> 2. Please provide the following quantities of proposed hard surfaces in square feet: <br /> Proposed Roof Area: 3,600 SF <br /> Proposed Other Hard Surfaces (pavement,gravel, etc.): 0 <br /> 3. How will you manage rooftop runoff after the project is completed? <br /> The two new downspouts will be connected to the existing storm detention pipe. <br /> 4. How will you manage stormwater runoff from hard surfaces(driveways, paved pathways, <br /> patios,etc.)? Evaluate each type of hard surface separately. <br /> N/A. We are not adding any hard surfaces other than the roof. <br /> Plan for Permanent On-Site Stormwater Management: <br /> You are required to "infiltrate, retain, and disperse stormwater" on your site to the maximum extent <br /> you can without causing erosion or flooding.The goal is to get stormwater runoff in contact with <br /> vegetated surfaces as much as possible before discharging to downstream conveyance systems. <br /> See Volume III, Chapter 12 of the 2010 Storm water Management Manual for stormwater facility <br /> requirements: https://everettwa.gov/DocumentCenter/Home/View/1214 <br /> 1. Determine which options you must use for managing stormwater from rooftops via downspout <br /> disconnect by considering the following Best Management Practices (BMPs) in order: <br /> • BMP 12.30 On-site Infiltration Areas <br /> • BMP 12.40 Raingardens <br /> • BMP 12.50 Downspout Dispersion <br /> Notes: <br /> a. If location criteria can be met, but sizing criteria cannot, you must implement the BMPs to <br /> the maximum extent you can without causing erosion or flooding. Pre-sized facilities have <br /> been designed to meet 100% mitigation. Facilities may be able to be installed to achieve <br /> some stormwater mitigation. <br /> b. Other innovative downspout control BMPs such as rain barrels, ornamental ponds, <br /> downspout cisterns, dry wells, or other downspout water storage devices may also be used <br /> with prior approval by the City of Everett.These are options to consider after the above <br /> listed BMPs are evaluated. <br /> 2. Determine which options you must use for managing stormwater from hard surfaces (driveways, <br /> paved pathways, etc.) by considering the following for each type of hard surface proposed: <br /> • BMP 12.60 Concentrated Flow Dispersion <br /> • BMP 12.70 Sheet Flow Dispersion <br /> Note: Propose an alternative stormwater management plan if none of the above BMPs can feasibly be <br /> installed. (Examples:Shallow vegetated swale, perforated pipe stub-out, etc.) <br /> Provide your Evaluation below and Show where these will take place on a site map: <br /> The project will add 3,600 SF of roof and two downspouts that will be connected to the existing storm <br /> detention pipe on site. <br /> CL'age 3 of 7) <br /> CI1Y Y OF EVERETT 13200 Cedar Street I Everett, WA 98201 1425-257-8810 I everettwa.goV`' <br />
The URL can be used to link to this page
Your browser does not support the video tag.