My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/05/07 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/05/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2017 8:30:07 AM
Creation date
1/11/2017 8:29:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/7/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B 1 1 <br /> COMPENSATION <br /> !Answer questions during construction period 0' 01 8r 0! 010' 0 <br /> — — __ �--- L — — <br /> Assist Facilities with reviewing submittals 0 0 6i 01 13:L_ 0i 0 <br /> Site visits during construction(assume 2 plus Punch List) 0 0 12 0 0 01 01 <br /> SUBTOTAL HOURS 2 0 38 0 0 0 I <br /> WAGE RATES $90.001 $75.00 $65.00 $45.00 $75.00 $65.00! $36.00 <br /> SUBTOTAL WAGES $ 180 $ ! $2,470 $ $ $ <br /> $ 36.00 <br /> SUB-TOTAL ARCHITECTURAL FEE ESTIMATE $ 2,686.00 <br /> —. <br /> CONSULTANT FEES: <br /> MECHANICAL ENGINEERING-RICE GROUP $ 2,030.00 <br /> ELECTRICAL ENGINEER-AWA ELECTRICAL CONSULTANTS $ 1,584.00 <br /> MARK-UP(OVERHEAD) 10.00% $ 362.00 <br /> SUB-TOTAL CONSULTANT FEES $3,976.00 <br /> TOTAL ARCHITECTURAL/ENGINEERING FEE- $ 6,662.00 <br /> PHASE 2 <br /> TOTAL FEE ESTIMATE —_ -.— $28,334.00 <br /> Mechanical Fee Estimate Phase 1 Contract Documents i <br /> List of Activities-(Manhours) Principal Mech. Drafting Clerical <br /> Task 'Description Eng. <br /> 1 (2)Site visits to observe exisitng conditions 6 <br /> 2 Meet with faciltiy staff I <br /> 3 Load calculations 6 <br /> 4 Preliminary design and cost estimate 5 I0 <br /> 5 Final plans 8 14 <br /> 6 Specifications 6 1 <br /> 7 Submittals(35%,65%,90%) 3 6 <br /> 8 Mechanical ecode forms 1 <br /> 9 coordinate sprinkler head locations 2 <br /> Total Hours: 0 38 30 1 <br /> Composite Rates: $93 $82 $62 $36 <br /> Subtotals: $0 $3,116 $1,860 $36 <br /> Total Fee: I $5,012 <br /> Mechanical Fee Estimate Phase 2 Bidding and Construction <br /> Estimate of Activities-(Manhours) Principal Mech. Drafting Clerical <br /> Task !Description Eng. <br /> I Answer questions during bidding 1 <br /> 2 attend Pre-construction meeting 4 <br /> 3 Shop Drawing review 4 4 <br /> 4 2 site visits 8 <br /> 5 Respond to rfi's 6 <br /> Total Hours: 0 23 0 4 <br /> Composite Rates: $93 $82 $62 $36 <br /> ------ ---- Subtotals: $0 $I-886 $0 $144 <br /> Total Fee: S2,030 <br /> 12 a 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.