Laserfiche WebLink
11 EXHIBIT B <br /> COMPENSATION <br /> AWA Electrical Consultants,Inc. FEE ESTIMATE WORKSHEET <br /> 1 Senior Engineer I ACAD 1 Clerical Total <br /> i <br /> TASK $95 $80 S62 $45 ' <br /> I. Initial Site Visit 3 $285 <br /> 2. Meeting 3 $285 <br /> 13. Preliminary Drawings 4 4 $568 <br /> 4. Construction Documents,including I 22 16 $2,847 <br /> 5. Telecommunications Drawings I 4 2 $539 <br /> 6. Specifications 2 2 $280 <br /> 7. NREC 2 $160 <br /> Forms <br /> 8. Review Submittals Q 35%&65% 5 2 $524 <br /> ,9. Final Review and Coordination(100%Review) 2 2 I $412 <br /> 12 39 25 2 <br /> Subtotal $5,900.00 <br /> Phase 1 <br /> 10. Bidding Phase 3 1 $285 <br /> 11. Assistance During Construction 3 10 2 2 $1,299 <br /> a. Review Submittals <br /> b. Coordination <br /> Questions <br /> c. 2 Site Visits <br /> 31 13 2 3 <br /> Subtotal Phase 2 $1,584.00 <br /> L <br /> 13 <br /> 59 <br />