Laserfiche WebLink
• <br /> EXHIBIT A 6 <br /> SCOPE OF WORK <br /> EXHIBIT B <br /> COMPENSATION <br /> FEE PROPOSAL <br /> Forest Park Pool Building <br /> On-Call Mechanical Engineering Services <br /> City of Everett Parks & Recreation <br /> WORK TO BE PERFORMED <br /> Professional Mechanical Engineering Services on an "On-Call"basis. Work shall be authorized on a per <br /> task basis by the Park Development/ Construction Supervisor. .The City shall pay the Contractor a sum <br /> equal to the amount of hours actually worked multiplied by the rate identified herein for the staff <br /> performing the Work, subject to a maximum of$12,000 with a maximum total of$650 in reimbursables <br /> included within. <br /> Responsibility Rate <br /> Principal $90.00/hour <br /> Mechanical Engineer $80.00/hour <br /> Drafting $60.00/hour <br /> Clerical $35.00/hour <br /> FEE PROPOSAL <br /> Forest Park Pool Building <br /> Shower Area Loft and Mechanical Room Loft Exhaust <br /> City of Everett Parks & Recreation <br /> Presented To: Henry Schroder <br /> June 5, 2003 <br /> DESCRIPTION OF PROJECT <br /> The existing pool recreation facility has a loft area above the Men's & Womens's Shower areas <br /> and the overhead area of the Mechanical Room that is not ventilated to prevent heat and moisture <br /> build-up. This heat and moisture build up (particularly durin¢ the warm outdoor season) <br /> • <br /> becomes unacceaDtable for the Staff to perfotrn service, maintenance and inspection. We will act <br /> as a prime consultant for this phase of work bringing in an Electrical Consultant to provide <br /> electrical related design services. <br /> SCOPE OF SERVICES <br /> RICE Croup, Inc. shall provide Mechanical Desi Services for the Exhaust Systems as follows: <br /> •Site Visits for Etsting Conditions • <br /> • Establish Existing Conditions at Loft Are and Upper area of Mech. <br /> Room <br /> •Establish Exhaust.air Quantities <br /> • Design Exhaust Systems <br /> • Establish Electronic Drawings for Design <br /> • Coordination with Structural and Electrical Consultants <br /> • Preparation of Division 15 Specifications <br /> • Meetings as Required with Owner for Coordination <br /> • Finalize Construction Docuinenu for Public Bid • 30 <br /> • Provision of related EIectrical Design Services <br />