My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/07/09 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/07/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2017 10:13:01 AM
Creation date
1/11/2017 10:12:43 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/9/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> Bid Period Services Construction Administration <br /> •Pre-Bid Meting • Pre-Construction Meeting <br /> •Response to Questions from Bidders •50% Completion Site Visit <br /> +Review Alternate Manufacturer Requests •Response to Field Questions <br /> •100%Cornpledan Site Visit <br /> •Shop Drawing Review <br /> •Contractor As-Buhl Drawings on AutoCadd <br /> •Air Balance Report Review <br /> • <br /> FEE: RICE Group, Inc.'s fee shall be billed hourly not to exceed$10,415.00 broken down as <br /> fellows: <br /> Mechanical Construction Documents i S 5.308.00 <br /> Mechanicl Bid Period& Construction Services i S 1.457.0 <br /> Mechanical Reimbursable Excerses (estimated) ; S 100.00 <br /> Mechanical Services Total- S6,86S.00 <br /> I Electrical Design&Coordination $ 2,875,00 <br /> Electrical Bid Period 3c Construction Service -$ 575.00 <br /> plectrical <br /> Reimbursable E:coenscS (estimated) $ 100.00 <br /> Electrical Services Total $3,550.00 <br /> Total Contract $ 10,415.00 <br /> E:fusions:Building El emenr Design(walls,ceilings,etc),Srrucrunrl Design <br /> FEE PROPOSAL <br /> Forest Park Pool Building <br /> Ductwork Replacement Construction administration <br /> Additional Services <br /> City of Everett Parks & Recreation <br /> Presented To: Henry Sc:.roder <br /> June 6, 2003 <br /> DESCRIPTION OF PROJECT <br /> There were unforeseen conditions that occurrcd during the c nnstrlction adminiszratleni phase of <br /> the ductwork rep acerncnt in the Mee finical Room (t e construction is completed wi.h.reject <br /> close-out close at hand). The result was a requirement to spend time that extended oeyor.d our <br /> budgeted allowances for this phase of sets'ices (reference cur proposal dated October 10, zoo2),; <br /> According to our oast conversations, we are submir:no additional ccrrpensation for tins service. <br /> FEE: RICE Group. c.c.'s fee shall be billed hourly not :o exceed 55.420.00 broken down as <br /> follows: <br /> • <br /> 3udgeted Mechanical Construction Administration I S-1,760.1)0 <br /> Construction Administration Scent to June 6 ' S 6,240.00 <br /> Estirnated.Constractien Administration to Close-Cut of Project ; S 960.00 • <br /> Total Requested Additional Construction Administration S 5,1,10.00 <br /> TOTAL FEE AMOUNT- S27,855.00 <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.