My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5107 SOUND AVE 2017-01-14
>
Address Records
>
SOUND AVE
>
5107
>
5107 SOUND AVE 2017-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2017 12:07:08 AM
Creation date
1/13/2017 7:24:40 AM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5107
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21, 2014 <br />Two Single-Family residences <br />L&A Job No. 14-065 <br />Page 14 <br />loading. The wall should be designed for a factor of safety of at least 1.15 against sliding <br />failure and 1.2 against overturning failure under seismic loading. <br />A drain line consisting of perforated, rigid PVC, drain pipes, at least 4 inches in diameter, <br />should be installed at a few inches below bottorri of retaining wall to intercept and drain <br />away groundwater flowing towards the wall. The drain line should have sufficient slope <br />(0.5 percent minunum) to generate flow by gravity, and water collected in the drain line <br />should be tightlined to discharge into a storm sewer or suitable stormwater disposal <br />faciiities. The drain line should be wrapped in a layer of non-woven filter fabric, such as <br />, ,, ,., i Tr ,.,�; � , , .,, , � „ , �, ,>� ,�T . ��r�al , �a�d �;o��1PtPlv ernb�dded ir� clean washed <br />. �., �, ��1 <br />, r _l,. ,, �- � � , <br />gra�el or cr�shed rock to within about 1� inc���s oi �he ��ish g�ad�. �'� v�3��cal ��a�i�ag�, <br />blanket at least 12 inches thick, consisting of clean, 3/4 to 1-1/2-inch, washed gravel or <br />crushed rocl�, should be placed against the wall. Altematively, a vertical drain mat, such <br />as Miradrai�a 6000 by Mirafi Inc., or approved equal, may be placed against the walls as <br />the vertical drainage blanket. The vertical drainage blanket or drain mat should be <br />hydraulically connected to the drain line at the base af the retaining wall. <br />Soldier Pile Wall <br />A cantilever soldier pile retaining wall may also be constructed along the toe of the <br />hillside as a.� option to stabilize tl�e hillside. A soldier pile wall is constructed by drilling <br />holes into the ground, inserting steel beams in the hoies, and filling the holes with <br />structural concrete. Timber boards, treated for outdoor and soil contact use, are placed <br />against cut �ank between soldier piles. The saldier pile wall should be designed for an <br />active soil pressure of 35 pcf EFD (equivalent fluid density) plus 0.75�3 pcf, where � is <br />L�U & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.