Laserfiche WebLink
6 EXHIBIT B • <br /> COMPENSATION <br /> The City shall pay the Contractor a fixed sum of Thirty-One Thousand Ninety-One Dollars ($31,091.00). <br /> Classification Hours Rate Cost <br /> Principal 73 x $100.00= $7,300.00 <br /> Project Manager 0 x $90.00= $0 <br /> Senior Project designer 132 x $80.00= $10,560.00 <br /> Project Architect 1 70 x $80.00= $5,600.00 <br /> Project Architect 2 0 x $70.00= $0 <br /> Project Architect 3 0 x $60.00= $0 <br /> job captain 0 x $60.00= $0 <br /> Intern Architect 33 x $50.00= $1,650.00 <br /> interior Designer 0 x $95.00= $0 <br /> Office Manager 0 x $45.00 = $0 <br /> TOTAL DSC = $25,110.00 <br /> SUBCONSULTANT COSTS = $4,500.00 <br /> SUB TOTAL: _ $29,610.00 <br /> BNH 5% $1,481.00 <br /> GRAND TOTAL: $31,091.00 <br /> Prepared By: _gregory July 21, 2003 <br /> minaker <br /> 11 <br />