My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:04:49 AM
Creation date
1/13/2017 10:04:22 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> CITY OF EVERETT <br /> DESIGN OF SCHEDULE A FACILITIES FOR UPGRADE OF THE EVERETT WATER <br /> POLLUTION CONTROL FACILITY(WPCF) <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> Planned engineering services to be performed in accordance with Article 1 of the Agreement comprise and <br /> are limited to those specifically set forth in this exhibit.These services are for the final design,bid assistance, <br /> and construction management assistance work associated with the Project,as described herein. The Scope of <br /> Work for this Project assumes that all construction activities will occur on the existing EWPCF site. It is also <br /> based on the assumption that the City will hire a Construction Contractor(General Contractor/Construction <br /> Manager-GC/CM)under a separate Agreement with the City. This Construction Contractor will participate <br /> with Brown and Caldwell for aspects of the scope of work as defined in this Agreement <br /> The specific elements of the work in this Agreement are subdivided into the following tasks: <br /> Task Title <br /> Task 501 Upgrade Existing Base Mapping and As-Built Drawings <br /> Task 502 Geotechnical Investigations <br /> Task 511 Civil Design <br /> Task 512 Architectural Design <br /> Task 513 Structural Design <br /> Task 514 Mechanical Design <br /> Task 515 Electrical Design <br /> Task 516 Instrumentation and Controls Design <br /> Task 520 Permitting Assistance <br /> Task 530 Construction Cost Estimate and Construction Schedule <br /> Task 540 Quality Control and Assurance <br /> Task 550 Document Preparation and Bid Assistance <br /> Task 610 Submittal Review <br /> Task 620 Change Order Preparation <br /> Task 630 Miscellaneous Office Engineering <br /> Task 640 On-Site Field Services <br /> Task 650 Materials Testing <br /> Task 660 Operations and Maintenance Manual <br /> Task 670 Startup Services <br /> Task 680 As-Built Documentation <br /> Task 710. Project Management <br /> Task 720. Unanticipated Services <br /> Page 1 <br /> S_\TMarks\WPCF\Brown & Caldwell\bchibit A-Scope of Work ver 5.doc <br /> 1 5 <br /> P* <br />
The URL can be used to link to this page
Your browser does not support the video tag.