My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:04:49 AM
Creation date
1/13/2017 10:04:22 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> OVERVIEW OF DESIGN WORK <br /> The design work will be conducted with participation by the City and the City's designated GC/CM <br /> contractor. City staff and staff from the GC/CM contractor will be assumed to participate in regularly <br /> scheduled meetings during the course of design to provide input to the design process. Decisions, <br /> discussions,and information to be transferred will be documented. It is further assumed in this Scope of <br /> Work that the GC/CM contractor will lead efforts to develop the construction schedule,construction <br /> sequencing,principal construction cost estimates,to review the design for constructibrlity. The GC/CM <br /> contractor will also provide guidance as to the level of detail required in the design products. <br /> This scope of work is based on Schedule A improvements to the Everett Water Pollution Control Facility <br /> (EWPCF),as defined in the 2003 Everett Water Pollution Control Facility-Facilities Plan and Basis of Design <br /> Report. The schedule A project represents the first stage of implementation of the 2022 project that was <br /> based on 2022 flows,loads,and loading thresholds. Table I lists the Schedule A improvements. The <br /> Schedule A Improvements are discussed in more detail below. <br /> Table 1. Schedule A Improvements <br /> Element <br /> Headworks grit system improvements <br /> Headworks Splitter Box Mechanically Cleaned Screens <br /> Two new primary clarifiers with scum and sludge <br /> collection and primary gallery <br /> Primary scum dewatering and grit removal <br /> Sludge dispersion piping modification <br /> New hypochlorite generation facilities <br /> North effluent pump station improvements <br /> Two new trickling filter pumps with new VFDs <br /> Trickling filter modifications(rotary distributors) <br /> Primary Clarifier Biofilter <br /> Flow monitoring improvements <br /> Biosolids storage and processing facilities <br /> Administration Building improvements <br /> Diversion structures <br /> Electrical Upgrades <br /> Page 2 <br /> S:\TMarks\WPCF\Brown & Caldwell\Exhibit A-Scope of Work ver 5.doc <br /> • <br /> -fg 1 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.