My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/03 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:12:03 AM
Creation date
1/13/2017 10:11:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. The interior finish work for the Conference Center's Shell was transferred from <br /> PCL/LMN's contract to BNH. This interior work included the outer lobby, all interior <br /> sides of the exterior wall, all columns, all restrooms, the exterior design for the <br /> elevators, ect: <br /> A. These changes involved architectural, electrical and interior design <br /> consultation. <br /> • Architectural Design and coordination 219 hrs $24,080.00 <br /> • Electrical Consultation 30 hrs 3,300.00 <br /> • Interior Design 42 hrs 4,620.00 <br /> • Faithful & Gould, estimating consultant 20 hrs 2,500.00 <br /> 21. Review of PCL's shell contract: <br /> A. Review contract <br /> • 12/02 <br /> • Review and comment on the shell contract 46 hrs <br /> • Total 46 hrs $5,060.00 <br /> Total $160,800.00 <br /> Amendment 13 <br /> - Page 8 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.