Laserfiche WebLink
AGENDA ITEM COVER SHEET 2 <br /> A <br /> PROJECT TITLE: Initialed by: <br /> AWARD OF CONTRACT FOR THE EAST Department Head: • _to-7 ' <br /> EVERETT PEDESTRIAN WALKWAY CAA <br /> PROJECT (STAGE 2), FROM HEWITT Council President: aAVENUE TO 20TH STREET. <br /> LOCATION: COUNCIL BILL # <br /> Originating Department Engr./Public S?rvices <br /> Hewitt Avenue to 20th Street Contact Person Brian Jones • <br /> Phone Number 257-8922 <br /> FOR AGENDA OF: August 27, 200' <br /> Preceding Action: Consent Second Reading <br /> 4/30/03 Council authorized call for bids. X Action Third Reading <br /> First Reading Public Hearing <br /> Attachments: Department(s)Approval (Identify): <br /> Bid Summary Legal <br /> Expenditure Required $226.841.50 Account Number(s): <br /> Amount Budgeted $226;841.50 PW2696 <br /> Additional Required -0- <br /> SUMMARY STATEMENT: <br /> This project includes the widening and construction of approximately 4,895 lineal feet of concrete <br /> sidewalk, curb and gutters, curb ramps, concrete inlets, and all other appurtenances necessary to complete <br /> the project. <br /> Five bids were received, as shown on the attached summary. The apparent low bid submitted by A-1 <br /> Landscaping and Construction has been determined to be not the lowest responsive or responsible bidder. <br /> Therefore. the lowest responsive and responsible bid was submitted by Schwetz Construction , Inc., Sedro <br /> Woolley, WA. <br /> The funding sources for this project are as follows: <br /> STP (Federal) $182,282.00 <br /> Fund 301-Arterial Streets 44.559.50 <br /> TOTAL $226,841.50 <br /> RECOMMENDATION: (Exact action requested for Council): <br /> Accept the bid and authorize award of the construction contract for the East Everett Pedestrian Walkway <br /> Improvements (Stage II) to Schwetz Construction, Inc., Sedro Woolley, WA, the lowest responsive and <br /> responsible bidder in the amount of$226,841.50. <br /> 3 <br /> Bid Award - East Everett Ped. Walkway 2.doc <br />