My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/03 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 10:12:03 AM
Creation date
1/13/2017 10:11:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 4 <br /> East Everett Pedestrian Walkway (Stage 11) <br /> W.O. #2696 <br /> Bid summary <br /> A-1 Landscaping & Const $199,378.74 <br /> Schwetz Construction , Inc. $226,841.50 ** <br /> Precision Earthworks. $237,477.00 <br /> Dennis R. Craig Const., Inc $269,305.75 <br /> Construct Company, LLC. $297,871 .20 <br /> Engineer's Estimate. $213,206.00 <br /> ** Determined to be the lowest responsive and responsible bid. <br /> • <br /> Bid Award- East Everett Ped. Walkway 2.dec <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.