Laserfiche WebLink
t <br /> 3. Fire mitigation design study/fire sprinklers: <br /> Items that needed to be done to meet fire codes that were not a part of the shelled- <br /> out building: <br /> A. Roof vents: <br /> • Start 01/06/03 End 03/14/03 <br /> • 20 file documents, 80 pages 4 hrs <br /> • Research 6 hrs <br /> • Design coordination and management 6 hrs <br /> • TI RFI to PCL 3 hrs <br /> • CD drawings 8 hrs <br /> • Total 27 hrs $2,970.00 <br /> B. Extra fire sprinklers: <br /> • Start 01/10/03 End 06/04/03 <br /> • 30 file documents, 50 pages 5 hrs <br /> • Special meetings 4 hrs <br /> • Design coordination and management 12 hrs <br /> • Total 21 hrs $2,310.00 <br /> C. Cost analysis. Review and revision per comments: <br /> • Start 01/14/03 End 05/16/03 <br /> • 30 file documents, 80 pages 6 hrs <br /> RCJear 1.1 1I/study 6 hrs <br /> • Design coordination and management 12 hrs <br /> • Faithful & Gould, estimating consultant 16 hrs <br /> • Total 40 hrs $4,560.00 <br /> 4. Elevator, lifts, ramp studies: access and circulation <br /> A. Research & drawings: <br /> • Start 01/21/03 End 02/14/03 <br /> • 25 file documents, 80 pages 21 hrs <br /> • Research/study 16 hrs <br /> • Faithful & Gould, estimating consultant 40 hrs <br /> • Drawings, 11x7, 7 options, 18 sheets <br /> • Architect 15 hrs <br /> • Drafter 24 hrs (a $70/hr <br /> • Total 116 hrs $12,440.00 <br /> Amendment 7 <br /> - Page 2 - <br />