Laserfiche WebLink
3 <br /> 5. Changes to kitchen equipment: <br /> Centerplate asked for changes to the kitchen equipment. <br /> A. Bid item studies and proposed revisions: <br /> • Start 02/25/03 End 04/28/03 <br /> • 63 file documents, 120 pages 10 hrs <br /> • Food service consultant studies, <br /> and recommendations 32 hrs <br /> • Design coordination and management 11 hrs <br /> • Total 53 hrs $5,830.00 <br /> 6. Acoustic study, and evaluation: <br /> Acoustical connection between the Special Events Center and the City Building was <br /> evaluated. <br /> A. Several doors were installed to create a better acoustical connection between <br /> the buildings: <br /> • Start 01/13/03 End 05/22/03 <br /> • 67 file documents, 100 pages 20 hrs <br /> • Design coordination and management 10 hrs <br /> • Acoustical consultant reports (Yantis) <br /> 02/14/03, 03/21/03 and 04/15/03 16 hrs © $160/hr (consultant) <br /> • Total 46 hrs $5,860.00 <br /> 7. Security study: <br /> Improved security between buildings. <br /> A. We met and the result was to change the access to the second elevator on <br /> the ground floor along with adding doors at several locations on the other <br /> floors: <br /> • Start 03/14/03 End 04/04/03 <br /> • 3 file documents, 10 pages 3 hrs <br /> • Design coordination and management 3 hrs <br /> • Sketch drawings, 3 at 81/2"x11" 12 hrs <br /> • Revise CD drawings 4 hrs <br /> • Total 22 hrs $2,420.00 <br /> B. Revise outer lobby design. <br /> • Start 02/26/03 End 06/13/03 <br /> • 29 file documents, 50 pages 5 hrs <br /> • Research and sketches 22 hrs <br /> • CD drawings 10 hrs <br /> • Addendum deletion of same 1 hr <br /> • Magnusson Klemencic Associates 20 hrs <br /> • Design coordination and management 2 hrs <br /> • Total 60 hrs $6,600.00 <br /> Amendment <br /> - Page 3 - <br />