My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2018-01-30
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2018-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 11:40:53 AM
Creation date
1/13/2017 10:54:10 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A summary of the Project Drainage Area(PDA) is as shown in Table 1 below: <br /> TABLE 1 -- TOTAL PROJECT DRAINAGE AREA <br /> Area <br /> Description Proposed Surface <br /> ID SF Ac <br /> Existing School Property Area <br /> New NW Parking Lot Access from 127th PL SE & New& Replaced <br /> New Entry from SR-527 Surface/Grading 'A 71,683 1.65 <br /> Restriping, Sidewalk & <br /> Curbing in West& <br /> Remaining School Property Area Excluding Area B3 South Parking Lots C 412,003 9.46 <br /> 483,686 11.10 <br /> Area Outside Lot 7 Property Lines &within School New& Replaced <br /> Property Surface/Grading B3 2,276 0.05 <br /> 485,962 11.16 <br /> Future Lot 7 Area <br /> Lot 7 To Be Acquired by EPS for Access from 129th <br /> Place SE New& Replaced B 10,131 0.23 <br /> Area Outside Lot 7 Property Lines w/in ROW New& Replaced B2 1,509 0.03 <br /> 11,640 0.27 <br /> Total Project Drainage Area (PDA) 497,602 11.42 <br /> Notes: <br /> 1. Per Area Takeoff Calculations 11/25/02 <br /> Existing Offsite and Site Discharges <br /> ❖ Offsite—Offsite flows from upstream areas to the south pass through the School <br /> Property via an existing 12-inch pipe under the playfields to the North. See Section <br /> 3 —Upstream Analysis for detailed description of these conditions. <br /> ❖ Northwest—The western half of the School Property site discharges via catch basins <br /> and sheet flow into the SR-527 conveyance system. See Section 4—Downstream <br /> Analysis <br /> ❖ Northeast—The eastern half of the School Property and Lot 7 Area discharges via <br /> catch basins,sheet flow and subdrainage to a 12-inch pipe at the north property line <br /> that extends through the Hershclip subdivision to an existing detention pond. <br /> Targeted Drainage Report for Everett Public Schools Section 2—Risk&Erosion Control <br /> Silver Lake Elementary Parking Lot Expansion January 6,2003 <br /> By: Perteet Engineering Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.