My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5785
>
Resolutions
>
Resolution 5785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 9:37:51 AM
Creation date
1/17/2017 9:37:18 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5785
Date
6/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 5 Six-year Transportation Improvement Program <br /> Agency Everett From 2007 to 2012 <br /> County No. 31 <br /> City No. 420 HearingptionDate RdsDa <br /> MPO PSRC <br /> Resolutionn No No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B.Bridge No. Federal Funding Local Agency <br /> C.Project Title <br /> R/W <br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E.Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Emir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy)-Code Phase Code Funds Funds Funds (2007) (2008) (2009) 6th Type (MM/YY) <br /> 1 23 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 17 1 2 phases in project 0 <br /> Collector 8 P/S 0.2 C PE 1/1/2009 RTID 2000 2000 1000 1,000 <br /> Arterial East Everett Ave.BNSF O'crossing-Railway Ave. P RW 9/1/2011 RTID 500 500 500 <br /> Everett Evenue T CN 8/12012 FMSIB 2,500 2500 2500 <br /> East Grand Avenue to Railway Avenue 0 RTID 11000 11000 11000 <br /> Design and construct arterial overcrossing Total _ 16,000 0 16.000 0 0 1,000 15,000 <br /> 17 2 2 phases in project 32 P/S 0.3 C PE 1/1/2007 STP(E) 65 50 115 115 <br /> Collector P <br /> Arterial Holly Drive Non-Motorized Improvements T CN 6/30/2008 CMAO 409 129 538 538 CE <br /> Holly Drive 0 <br /> 4th Avenue West to 92nd Street <br /> Design and construct pedestrian/bike improvements Total_ 474 0 179 853 115 538 0 0 <br /> 17 3 3 phases in project 32 S - 0.1 P PE 6/12003 STPXP 10 10 20 <br /> Collector T RW 6/1/2004 STPXP 10 10 <br /> Arterial Bond Street Bike and Pedestrian Improvements 0 CN 6/1/2007 STPXP 230 230 230 CE 8/1/2005 <br /> Bond Street <br /> Kromer Avenue to Terminal Avenue <br /> Design and construct pedestrian/bike improvements Totals 250 10 260 230 <br /> 17 4 2 phases in project 5 P 0.5 C PE 1/1/2008 350 350 350 <br /> Collector P CN 6/1/2009 3000 3000 3000 <br /> Arterial Chestnut Street/Eclipse Mill Road Improvements T <br /> Chestnut Street and Eclipse Mill Road 0 <br /> Pacific Avenue to 36th Street <br /> Design,constnrct road widening,intersec.impr. Totals 0 3350 3350 0 350 3,000 0 <br /> 17 5 3 phases in project 32 P 0.8 C PE 1/1/2008 AIP 50 50 100 100 <br /> Collector P RW 5/1/2009 AIP 100 100 200 200 <br /> Arterial 36th Street/Smith St Ped,Bike,Landscape Improv. T CN 5/1/2010 AIP 350 350 700 700 <br /> 36th Street and Smith Street 0 <br /> Broadway to Smith Avenue;36th to 33rd Street <br /> Design,build bike,ped&landscape improv. Totals 500 500 1000 0 100 200 700 <br /> 17 6 3 phases in project 6 P 1 C PE 1/1/2007 STPXP 20 20 20 <br /> Collector P RW 9/1/2007 STPXP 10 10 10 CE Yes <br /> Arterial 36th Street/BNSF At-grade Railcrossing Closure T CN 6/30/2008 STPXP 170 170 170 <br /> 36rth Street 0 CN 6/1/2006 <br /> 36rth Street at the BNSF Rail Line CN <br /> Design and construct improvements to close crossing Totals 200 200 0 20 180 0 <br /> 17 7 3 phases in project 32 P 0.2 C PE 1/1/2007 STP(E) 100 50 150 150 <br /> Collector P RW 11/12007 CMAO 86 64 150 150 CE Yes <br /> Arterial 36th Street/BNSF Rail Line Bike/Ped Crossing T CN 7/1/2008 CMAQ 432 68 500 500 <br /> 36rth Street 0 CN 612008 <br /> 36rth Street at the BNSF Rail Line CN <br /> Design and construct undercrossinq Totals 618 800 150 650 0 0 <br /> 17 8 2 phases in project 5 P 0.1 C PE 6/1/2008 AIP 30 20 50 50 <br /> Collector P CN 6/1/2009 AIP 250 200 450 450 <br /> Arterial 37th Street Improvements T <br /> 37th Street Improvements 0 <br /> Rucker Avenue to Wetmore Avenue <br /> Design,construct road widening,intersec.impr. Totals 280 220 500 00 50 450 0 <br /> 17 9 3 phases in project 32 P 0 P PE 1/1/2008 150 150 150 <br /> Collector T RW 1/1/2009 200 200 200 <br /> Arterial Smith Island bike/ped improvements CN 5/12010 650 650 650 <br /> various arterials on Smith Island <br /> various <br /> Arterial street improvements Totals 1000 1000 0 150 200 650 <br /> 17 10 3 phases in project 32 P 0.5 C PE 6/1/2008 AIP 45 30 75 75 <br /> Collector P RW 6/1/2009 AIP 75 50 125 125 <br /> Arterial Silver Lake Rd.-121st St SE Ped Improv. T CN 7/1/2010 AIP 180 120 300 300 <br /> Silver Lake Road-121st Street SE W 1000 1000 <br /> 112th Street to 19th Ave.SE(SR 527) 0 <br /> Design and construct pedestrian improv. Totals 300 200 500 0 75 125 1300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.