Washington State Department of Transportation Page 4 Six-year Transportation Improvement Program
<br /> Agency Everett
<br /> From 2007 to 2012
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars _ _ Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Age-icy
<br /> C. Project Title R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2007) (2008) (2009) 6th Type (MM/YY)
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 16 4 HP-1998(015); 3 phases in project;supercedes Lowell 1 S,P 0.25 S PE 7/1/2008 RTID 1,000 1,000 1,000
<br /> Minor Neighborhood Bypass P RW 7/1/2009 RTID 800 800 800
<br /> Arterial Lenora St./BNSF Rail Line Overcrossing CN 5/1/2010 RTID 6000 6000 6000
<br /> Lenora St.and BNSF Rail Line FMSIB 4300 4300 4.300
<br /> NA
<br /> Design and construct rail line overcrossinq Totals 12,100 12,100 0 0 1,000 11,100
<br /> 16 5 3 phases in project 4 P 0.9 C PE 1/1/2008 AIP 360 120 480 480
<br /> Minor Joint project with Sno.County-(County Lead) P RW 7/1/2009 AIP 387 129 516 516
<br /> Arterial 116th Street SE Improvements T CN 5/1/2010 AIP 2,060 744 2,804 2,804
<br /> 116th Street SE W
<br /> SR 527 to 35th Avenue SE G
<br /> Design,construct 3 lane street with bike&ped improv. Totals 2,807 993 3,800 0 480 518 2,804
<br /> 16 6 2 phases in project 4 P 1 C PE 2/1/2008 AIP 252 84 336 336
<br /> Minor P CN 6/1/2009 AIP 1,660 604 2,264 2,264
<br /> Arterial 100th Street SW Improvements T
<br /> 100th Street SW 0
<br /> Airport Road to Evergreen Way
<br /> Design,construct road widening&other improvements Totals 1,912 898 2,600 0 336 2,264 0
<br /> 16 7 3 phases in project 6 P 0.1 C PE 3/1/2010 75 75 75
<br /> Minor P RW 3/1/2011 50 50 50
<br /> Arterial Casino Rd.at Hardeson Intersec.Improv. T CN 5/1/2012 375 375 375
<br /> Casino Rd./Hardeson Rd. W
<br /> Intersection of Casino/Hardeson Rd. G
<br /> Design,construct intersection improvements Totals 500 500 0 0 0 500
<br /> 16 8 3 phases in project 4 P 0.5 C PE 1/1/2008 RTID 1,500 336 1,500
<br /> Minor Sno.Co.is lead agency P RW 1/1/2009 RTID 2,000 2,000 2,000
<br /> Arterial 4th Avenue West Improvements T CN 5/1/2010 RTID 5,500 5,500
<br /> 4th Avenue West W
<br /> 112th Street SW to 104th St.SW G
<br /> Design,construct street improvements Totals 9,000 0 2,338 0 0 1,500 7,600
<br /> 18 9 2 phases in project 6 P 2 C PE 2/1/2008 300 300 300
<br /> Minor P CN 5/12009 2,700 2,700 2,700
<br /> Arterial Colby Avenue Streetscape Improvements T
<br /> Colby Avenue W
<br /> 19th Street to 41st Street S
<br /> Design,construct streetscape improvements G Totals 3,000 3,000 0 300 2,700 0
<br /> 16 10 3 phases in project 4 P 1 C PE 1/1/2009 RTID 2000 2000 2,000
<br /> Minor P RW 1/1/2010 RTID 3,000 3,000 3,000
<br /> Arterial 100th Street SE Improvements T CN 5/12011 RTID 15000 15,000 15000
<br /> 100th Street SE w
<br /> SR 527 to 7th Avenue SE G
<br /> Design,construct street improvements Totals 20,000 0 20,000 0 0 2,000 18,000
<br /> 16 11 3 phases in project 6 P 1 C PE 1/1/2011 2000 2000 2000
<br /> Minor P RW 1/1/2013 3,000 3,000
<br /> Arterial 100th Street Improvements T CN 5/12015 15000
<br /> 100th Street SE (actual alignment to be determined) W
<br /> 7th Avenue SE to Evergreen Way G
<br /> Design,construct street improvements Totals 20,000 5,000 0 0 0 2,000
<br />
|