My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5785
>
Resolutions
>
Resolution 5785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 9:37:51 AM
Creation date
1/17/2017 9:37:18 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5785
Date
6/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2007 To 2012 Six-year Transportation Improvement Program <br /> Interstate Local Access and Other Projects <br /> 1. 1-5 Median HOV Lanes&Auxiliary Lanes 1. BNSF RR track relocation (Safety) <br /> 2. 1-5/41st Street Interchange&Related Improvements 2. BNSF RR safety improvements (Safety) <br /> 3. I-5/ 112th Street SE P&R,Flyer Stop,HOV Ramps 3. Roadway hazard elimination projects(Safety) <br /> 4. I-5/Downtown Everett Interchange Improvements <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave.) 1. Annual Street Overlay Program (Maintenance) <br /> 5. I-5/ 100th Street SE HOV Access/Undercrossing 2. Sidewalk repair and replacement (Maintenance) <br /> 6. NB Everett Mall Way/SB I-5 Onramp 3. Pavement marking projects (Maintenance) <br /> 7. I-5/Smith Island Interchange <br /> 8. I-5/East Marine View Drive Interchange Improvements 1. 106th Place SE Improvements (Street) <br /> 9. I-5 HOV hLanes(US 2 to SR 528) 2. 3rd Avenue SE Improvements (Street) <br /> 10. I-5/128th Street Interchange 3. Pine Street Improvements (Street) <br /> 11. I-5/128th Street HOV Ramps(Mariner PNR) 4. Upper&Lower Ridge Rd. Improvements (Street) <br /> 12. I-5/112 Street Interchange 5. Simpson Site Access Improvements (Street) <br /> Freeways 1. Traffic Signal Interconnect (Traffic Signals) <br /> 1. US 2 Improvements(I-5 to SR 204) 2. Traffic Signal Improvements (Traffic Signals) <br /> 2. SR 526/Hardeson Road Interchange 3. ITMS Upgrades (Traffic Signals) <br /> 3. SR 526 Extension(I-5 to US 2) <br /> 1. Neighborhood Block Grants (Neighborhoods) <br /> Principal Arterials 2. Neighborhood Traffic Studies/Projects (Neighborhoods) <br /> 1. East Marine View Drive Improvements(I-5 to SR 529) <br /> 2. Broadway/Beverly Blvd. Intersection Improvements 1. City Entryway Landscaping/Signs (Landscaping) <br /> 3. Evergreen Way Improvements(115th St. SW to Airport) <br /> 4. Broadway Corridor Improvements(4155 to SR 526) Non-Motorized Trail/Path Improvements <br /> 5. HES Projects(Brdwy/52°d,Brdwy/Madison,Forest Park) 1. Riverfront Walkway Overcrossing <br /> 6. Pacific Avenue/BNSF Grade Crossing Improvements 2. Riverfront Walkway Phase 1 <br /> 7. Rucker Ave./W.Marine View Dr.Connection Study 3. 41St Street Bike-Ped. Connector <br /> 8. CBD Comprehensive Transportation Plan 4. 7th Avenue SE Ped/Bike Improvements(92nd to 1126) <br /> 9. I-5 to Port of Everett Truck Route 5. Henry M. Jackson Ped.Bridge <br /> 10. Arterial Needs Study 6. Riverside Bus Pk.Ped.Trail <br /> 11. Arterial Streetscape Improvements(various locations) 7. West Marine View Drive Bike-Ped Separation <br /> 8. West/East Marine View Drive Bike-Ped Separation <br /> Minor Arterialsh �d 9. 47th Street Ped Improvements(Evergreen to B.F.Ln.) <br /> 1. 112Street SE Street Improv. (3 Ave. SE to I-5) 10. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 2. 112th Street SW/I-5 Bridge Widening 11. Grand Avenue/North Marina Ped-Bike Connection <br /> 3. 112th Street SW-SE Street Improvements(I-5 to SR 527) 12. Shoreline Access Imp.(Various Locations) <br /> 4. Lenora St./Lowell-River Rd./BNSF Rail Line Oxing. 13. Snohomish River Bike/Ped.Bridge <br /> 5. 116th Street SE Street Improvements(SR 527 to 35 ) 14. Everett Non-motorized Projects <br /> 6. 100th Street SW Street Improv. (Evergreen to Airport) (Various Locations in Everett) <br /> 7. Casino Rd./5th Avenue W.Intersection Improvements <br /> 8. 4th Avenue West Improvements(104th to 112th) Transit <br /> 9. Colby Avenue Streetscape Improvements <br /> 1. Bus Replacements-2007 to 2012 <br /> 10. 100th Street SE Improvements(SR 527 to 7th Ave SE) 2. Bus fleet expansion <br /> 11. 100th Street SE Improvements(7th Ave to Evergreen) 3. Regional Fare Coordination Project <br /> 4. Bus Cleaning Facility <br /> Collector Arterials HOV Projects <br /> 1. East Everett Avenue/BNSF Overcrossing 1. Everett Station Bicycle Demo Project <br /> 2. Holly Dr.Non-motorized Imp. (4th Ave.W.to 92°d) 2. Everett Station Park&Ride Parking Structure <br /> 3. Bond Street Ped/Bike Impr.(Kromer to Terminal)h 3. North Everett Transit Center <br /> 4. Chestnut St./Eclipse Mill Rd. Impr.(Pacific to 36th) <br /> 5. Silver Lake Road- 121St Street SE Ped.Improvements 4. Implementation of State CTR Law <br /> 6. 36th St./Smith St.Ped,Bike,Landscape Improvements Projects Shown in bold type were not included in the <br /> 7. 36th St./BNSF At-grade Rail Crossing Closure City's 2006-2011 Six-year TIP <br /> 8. 36th St./BNSF Rail Line Ped/Bike Crossing <br /> 9. 37th Street Improvements(Rucker to Broadway) <br /> 10. Smith Island Bike and Pedestrian Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.