|
CITY OF EVERETT 2007 TO 2012 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIO- PE RNV CONST. Est.2007-12 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 1 Interstate 1 IS Median HOV Lanes&Auxiliary Lanes SR 526 to US 2 Jan.99 Nov.04 May.05 50,000,000 WSDOT 1
<br /> 2 Interstate 2 1-5-41st Street Interchange 41st Street to US 2 Jul.03 Apr.06 50,000,000 WSDOT 2
<br /> 3 Interstate 3 I-5112th Street SE Direct Access HOV/PNR/Flyer Stops 1-5 at 112th Street SE Jan.02 Jul.05 Jul.06 20,000,000 ST&WSDOT 3
<br /> 4 Interstate 4 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Aves.,and US 2 Jan.09 Jun.11 Sep.12 28,500,000 EVERETT 4
<br /> 5 Interstate 5 1-5/100th Street SE HOV access/undercrossing 1-5 at 100th Street SE Jul.09 Jan.10 Jan.11 68,500,000 EVERETT 5
<br /> 6 Interstate 6 NB Everett Mall Way to SB 1-5 Onramp Everett Mall Way to 1-5 Jan.09 May.10 3,500,000 WSDOT 6
<br /> 7 Interstate 7 1-5/Smith Island interchange 12th Ave.NE or north of 12th Ave. Jan.10 Jun.11 Jul.12 10,000,000 EVERETT 7
<br /> 8 Interstate 8 1-5/East Marine View Drive Interchange 1-5 at East Marine View Drive Jan.09 Jun.10 Jun.12 16,000,000 EVERETT 8
<br /> 9 Interstate 9 1-5 HOV Lanes US 2 to SR 528 Jan.12 Jun.16 May.18 5,000,000 WSDOT 9
<br /> 10 Interstate 10 1.5/128th Street Interchange IS at 128th Street Jan.08 Jan.10 May.12 11,000,000 WSDOT 10
<br /> 11 Interstate 11 IS/128th Street HOV Ramps(Mariner PNR) 1S at 128th Street/Mariner PNR Jan.08 Jan.10 May.12 6,000,000 WSDOT 11
<br /> 12 Interstate 12 I-5/112th Street Interchange Study I-5 at 112th Street SE Jan.12 3,000,000 WSDOT 12
<br /> 13 Freeway 1 US 2 Improvements 1-5 to SR 204 Jun.09 Jun.10 Jun.12 115,000,000 WSDOT 13
<br /> 14 Freeway 2 SR 526/Hardeson Road Interchange SR 526 at Hardeson Road Jun.10 Jun.11 Jun.13 9,000,000 WSDOT 14
<br /> 15 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun.10 8,500,000 WSDOT 15
<br /> 16 Principal Arterial i East Marine View Drive Improvements North Broadway to Interstate 5 Mar.03 Jul.05 Mar.07 8,800,000 EVERETT 16
<br /> 17 Princi.al Arterial 2 Broadway/Beverly Blvd.Intersection Impr. So.Broadway at Beverly Blvd. Oct.04 Jun.07 683,000 EVERETT 17
<br /> 18 Principal Arterial 3 Evergreen Way Improvements,115th to Airport Road 11500 block to Airport Road Jan.09 Jul.10 425,000EVEREIT H
<br /> 19 Principal Arterial 4 Broadway Corridor Improvements SR 526 to 41st Street Feb.12 Feb.13 Jun.14 3,000,000 EVERETT
<br /> 20 Principal Arterial 5 HES Projects(Brdwy at 52nd&at Madison,Forest Pk entrances) Ev.Mall Wy.,Broadway,Colby Ave. Jan.07 Mar.08 900,000 EVERETT
<br /> 21 Principal Arterial 6 Pacific Avenue/BNSF Grade Crossing Improvements Pacific Avenue and Chestnut St. Jan.09 Jun.10 Jun.12 6,000,000 EVERETT 20
<br /> 22 Principal Arterial 7 Rucker AveJW.Marine View Dr.Connection Study Pacific Ave.and Wall Ave. Sep.07 75,000 EVERETT 21
<br /> 23 Principal Arterial 8 CBD Comprehensive Transportation Plan Downtown Central Business Dist. Jan.07 135,000 EVERETT 22
<br /> 24 Principal Arterial 9 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to 1-5 Jan.11 200,000 EVERETT
<br /> 25 Principal Arterial 10 Arterial Needs Study Various arterials within city limits Feb.07 200,000 EVERETT
<br /> 26 Principal Arterial 11 Arterial Streetscaping Improvements Various arterials within city limits Feb.08 Apr.09 400,000 EVERETT
<br /> 27 Minor Arterial 1 112th Street SE Improvements 3rd Avenue SE to Interstate 5 Jun.03 Sep.03 Jun.04 400,000 EVERETT
<br /> 28 Minor Arterial 2 112th Street SE 1-5 Bridge Widening 112th Street at Interstate 5 Jan.01 Sep.02 Aug.06 7,470,000. EVERETT in
<br /> 29 Minor Arterial 3 112th Street SE Improvements Interstate 5 to 19th Avenue SE Jan.07 Mar.08 Jul.09 4,906,000 Q EVERETT ri
<br /> 30 Minor Arterial 4 Lenora StJBNSF Rail Line Overcrossing Lenora St.&Lowell Sno.River Rd. Jul.08 Jul.09 May.10 12,100,0001EVERETT H
<br /> 31 Minor Arterial 5 116th Street SE Improvements SR 527 to 35th Avenue SE Jan.08 Jul.09 May.10 3,800,000 EVERETT
<br /> 32 Minor Arterial 6 100th Street SW Improvements Airport Road to Evergreen Way Feb.08 Jun.09 2,600,000' EVERETT El
<br /> 33 Minor Arterial 7 Casino Road at 5th Ave.W.Road Intersection Improvements Casino Road at Hardeson Road Mar.10 Mar.11 May.12 500,000 EVERETT
<br /> 34 Minor Arterial 8 4th Avenue West Widening and Improvement 104th Street to 112th St.SW Jan.08 Jan.09 May.10 9,000,000 SNO.CNTY. 30
<br /> 35 Minor Arterial 9 Colby Avenue Streetscape Improvements 19th Street to 41st Street Feb.08 May.09 3,000,000 EVERETT um
<br /> 36 Minor Arterial 10 100th Street SE Improvements SR 527 to 7th Avenue SE Jun.09 Jan.10 May.11 20,000,000 EVERETT MI
<br /> 37 Minor Arterial 11 100th Street SE Improvements 7th Avenue SE to Evergreen Way Feb.11 Jan.13 May.15 2,000,000 EVERETT Eil
<br /> 38 Collector Arterial i East Everett AveJ BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.09 Sep.11 Jun.12 16,000,000 EVERETT
<br /> 39 Collector Arterial 2 Holly Drive Non-Motorized Improvements 4th Avenue W.to 92nd Street Jan.07 Jun.08 800.000 EVERETT OMI
<br /> 40 Collector Arterial 3 Bond Street Ped/Bike Improvements Kromer to Terminal Ave. Jun.03 Jan.04 Jul.06 250,000 EVERETT
<br /> 41 Collector Arterial 4 Chestnut StJEclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.08 Jun.09 3,350,000 EVERETT
<br /> 42 Collector Arterial 5 36th Street/Snith Street Ped,Bike&Lndscp.Improv. Broadway to Eclipse Mill Rd.;36th to 33rd Jan.08 May.09 May.10 1,000,000 EVERETT
<br /> 43 Collector Arterial 6 36th Street/BNSF At-grade Rail Crossing Closure 36th St.&BNSF Rail Line Jan.07 Sep.07 Jun.08 200,000 ' EVERETT 39
<br /> 44 Collector Arterial 7 36th Street/BNSF Rail Line Ped/Bike Crossing 36th St.&BNSF Rail Line Jan.07 Nov.07 Jul.08 800,000 EVERETT 40
<br /> 45 Collector Arterial 8 37th Street Improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.08 Jun.09 500,0001EVERETT Ei
<br /> 46 Collector Arterial 9 Smith Island Bike/Ped improvements Various arterials on Smith Island Jan.08 Jan.09 May.10 1,000,000 EVERETT
<br /> 47 Collector Arterial 10 Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 Jun.08 Jun.09 Jul.10 500,000 III EVERETT m
<br /> 514,994,000
<br /> *A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type were not included in the 2006-2011 Six-Year TIP.
<br />
|