|
Page 1 Six-year Transportation Improvement Program
<br /> Agency Everett From 2007 to 2012
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A.Federal AM No. Fund Source Information Expenditure Schedule Projects Only
<br /> B.Bridge No. Federal Funding Local Agency
<br /> C.Project Title
<br /> RAN
<br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 41h Required
<br /> Functional Priority E.Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F.Describe Work to be Done Type_Status Length,Codes Phase (mm/dd/yy)_ Code, Phase Code Funds Funds Funds (2007) (2008) (2009) 6th Type (MM/YY)
<br /> 1 2 3 4 8 8 7 8 a 10 11 12 13 14 15 re 17 15 19 20 21
<br /> 111 3 phases in project 4 S 5.8 0 PE 1/1/1999 'WSDOT 18,300 18,300
<br /> Interstate various RW 11/1/2004 WSDOT 20,000 20,000
<br /> I-5 Median HOV Lanes and Auxiliary Lanes CN 5/1/2005 WSDOT 191,700 191,700 30.000 20,000
<br /> IS
<br /> SR 529(N.Broadway)to E.Marine View Drive
<br /> Design and construct Median HOV and GP aux.lanes _Totals _ 230,000 230,000 30,000 20,000 0 0
<br /> 11 2 3 phases in project 3 S .. 0.3 0 PE 7/1/2003 Disc. 1.000 WSDOT' 4,400 500 5,900 2,000
<br /> Interstate 5/630 P EA
<br /> 1-5/41st Street SE Interchange&Related Improvements T CN 4/1/2006 WSDOT 42,844 42,844 21600 21,600
<br /> I5,41st Street CN Disc. 4,800 4,800 4800
<br /> S.3rd Ave.to Colby Ave;38th Street to 43rd Street 0
<br /> Design and construct interchange improvements Totals 5,80047,244 500 53,544 23.800 28,400 0 0
<br /> 11 3 3 phases in project 3 S 0.1 0 PE 1/1/2002 J
<br /> Interstate 5/620 (Sound Transit is lead on project) P RW 7/1/2005 EA 2/1/2006
<br /> 15/112th Sl Direct Access HOV-P&R/Flyer Stop T CN 7/1/2006 STP-U 2,500 20,000 20,000 10,000 10,000
<br /> 1-5,112th Street SE
<br /> I-5/112th Street SE to I-5/112th Street SE
<br /> Design/Construct HOV Ramps,P&R Lot,Flyer Stop Totals 2,500 20,000 20,000 10,000 10,000 0 0
<br /> 11 4 3 phases in project 3 P 1.1 0 PE 1/1/2009 RTID 3,500 3,500 2,000 1,500
<br /> Interstate RW 6/12011 RTID 2,000 2,000
<br /> I5/Downtown Everett Interchange Improvements CN 9/1/2012 RTID 23,000 10,800 23.000
<br /> -5 at Pacific,Hewitt,Everett Avenues
<br /> Pacific Avenue to Everett Avenue
<br /> Major reconfiguration of IS offramps for Downtown Totals_ 28,500 28,500 0 0 2,000 26,500 _
<br /> 11 5 3 phases in project 1 P 0.1 - 0 PE 7/12009 - RTID 5,000 5,000 2,500 2,500
<br /> Interstate RW 1/1/2010 RTID 2,000 2,000
<br /> I-5/100th Street SE HOV Access/Undercrossing CN 1/1/2011 RTID 61,500 10.800 61,500
<br /> 15,100th Street SE
<br /> SR 527 to South Everett Transit Center area
<br /> Design and construct HOV access/undercrossing Totals 88,500 68,500 0 0 2,500 68,000
<br /> 11 6 2 phases in project 1 P 0.5 0 PE 1/1/2009 RTID 500 500 500
<br /> Interstate 5/099
<br /> 1-5/Everett Mall Way Onramp CN 5/1/2010 RTID 3,000 10,800 3,000
<br /> NB Everett Mall Way to SB 1-5
<br /> NB Everett Mall Way to SB 1-5
<br /> _ Design and construct Interstate Onramp Totals 3,500 3,500 6 500 0 3,000
<br /> 11 7 3 phases in project 1 P 0.5 0 PE 1/1/2010 WSDOT 1,000 1,000 2.000 2,000
<br /> Interstate RW 6/1/2011 WSDOT 1,000 2,000 3,000 3,000
<br /> 1-5/Smith Island Freeway Interchange CN 7/1/2012 WSDOT 8,000 12,000 20,000 5,000
<br /> IS at 12th SL NE or other location on Smith Island
<br /> 12th St.NE.or other location north of 12th St.NE
<br /> Design and construct freeway interchange Totals 10,000 25,000 0 0 0 10,000
<br /> 11 8 3 phases in project 3 P 0.3 0 PE 1/1/2009 WSDOT 3,000 1,000 4,000 1,500 2.500
<br /> Interstate RW 6/1/2010 WSDOT 1,500 500 2,000 2,000
<br /> IS/East Marine View Dr. Frey.Interchange CN 6/1/2012 WSDOT 17,000 7.000 24,000 10000
<br /> IS at East Marine View Drive FMSIB 5,000 5,000
<br /> IS©E.Marine View Dr.
<br /> Add on and off-ramp to and from the north Totals 26,500 8,500 35,000 0 0 1,500 14,500
<br /> 11 9 3 phases in project 4 P 5.6 0 PE 1/1/2012 WSDOT 18.300 18,300 5000
<br /> Interstate Various RW 6/1/2016 WSDOT 20,000 20,000
<br /> I5 Median HOV Lanes CN 5/1/2018 WSDOT 191,700 191,700
<br /> Interstate 5
<br /> US 2 to SR 528
<br /> Design and construct Interstate median HOV lanes Totals - i. 230,000 230,000 0 0 0 5,000
<br /> 11 10 3 phases in project 3 P 0.3 0 PE 1/12008 RTID 4000 4000 2000 2000
<br /> Interstate RW 1/1/2010 RTID 2,000 2,000 1000 1,000
<br /> IS/128th Street Interchange CN 5/1/2012 RTID 24000 24,000 5,000
<br /> IS at 128th Street
<br /> I-5 al 128th Street
<br /> Design and construct single-point urban interchange Totals 30,000 30,000 0 2,000 3,000 6,000
<br />
|