Laserfiche WebLink
Washington State Department of Transportation Page 2 Six-year Transportation Improvement Program <br /> Agency Everett From 2007 to 2012 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road merit Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length_Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2007) (2008) (2009) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 11 3 phases in project 3 P 0.3 0 PE 1/1/2008 RTID 2,000 2,000 1000 1000 <br /> Interstate RW 1/1/2010 RT1D 1,000 1,000 500 500 <br /> 1-5/128th Street HOV Ramps CN 5/1/2012 RTID 12,000 12,000 3000 <br /> 1-5 at 128th Street and Mariner PNR <br /> 1-5 at 128th Street and Mariner PNR <br /> Add NOV ramps to and from Mariner PNR(dl 128th St. Totals 15,000 0 15,000 0 1,500 1,500 3,000 <br /> 11 12 3 phases in project 3 P 0.2 0 PE 1/1/2012 WSDOT 3,000 3,000 3000 <br /> Interstate Various <br /> 1-5/112th Street Interchange Study <br /> Interstate 5 at 112th Street SE <br /> Interstate 5 at 112th Street SE <br /> Study possible Interchange improvements Totals 3,000 0 3,000 0 0 0 3,000 <br /> 141 3 phases in project 3 P 2.5 0 PE 6/1/2009 RTID 15,000 15,000 8,000 7,000 <br /> Freeways 5/640 RW 6/1/2010 RTID 50,000 50,000 50,000 EIS 3/1/2012 <br /> US 2 Improvements CN 6/1/2012 RTID 347,000 347,000 50,000 <br /> US 2 Improvements <br /> 1-5 and SR 204 <br /> Add lane each direction,improve interchanges Totals 412,000 412,000 0 0 8,000 107,000 <br /> 12 2 3 phases in project 3 P 0.3 0 PE 1/1/2010 WSDOT 4,000 4,000 4,000 <br /> Freeways RW 6/1/2011 WSDOT 11,000 11,000 5,000 EIS 3/1/2013 <br /> SR 526/Hardeson Road Interchange CN 6/1/2013 WSDOT 23,000 23,000 <br /> SR 526 <br /> SR 526 at Hardeson Road _ <br /> Add on and off-ramps Totals 38,000 0 38,000 0 0 0 9,000 <br /> 12 3 3 phases in project 1 P 0.3 0 PE 6/1/2010 WSDOT 8,500 8,500 8,500 <br /> Freeways 0 <br /> SR 526 Extension Study 0 <br /> SR 526 <br /> Interstate 5 to US 2 across the Snohomish Valley <br /> Study possible extension of SR 526 across Sno.Valle t Totals 8,500 0 8,500 0 0 0 8,500 <br /> 14 1 HP-1998(021) 4 phases In project 4 S 1.5 C PE 3/12003 DEMO 500 468 968 <br /> Principal P PE FAST 600 600 <br /> Arterial East Marine View Drive Improvements T RW 7/1/2005 DEMO 592 592 1 MCE 2/12007 <br /> East Marine View Drive 0 CN 3/1/2007 DEMO 3,808 FMSIB 600 859 5,267 7,300 1,500 <br /> North Broadway to Interstate 5 DEMO 3,500 3,500 <br /> Design,construct roadway widening and Improvements Totals 9,000 600 1,327 10,927 7,300 1,500 0 0 <br /> 14 2 2 phases In project 3 S 0.2 C PE 10/1/2004 AIP 45 22 67 <br /> Principal P CN 6/1/2007 AIP 455 228 683 683 <br /> Arterial Broadway/Beverly Blvd.Intersection Improv. T <br /> So.Broadway,Beverly Boulevard 0 <br /> Broadway at Beverly to SR 526 <br /> Design and construct Intersection improvements Totals 500 250 750 683 0 0 0 <br /> 14 3 2 phases in project 4 P 0.3 C PE 1/1/2009 75 75 <br /> Principal P CN 7/1/2010 AIP 225 200 425 425 <br /> Arterial Evergreen Way Widening T <br /> Evergreen Way 0 <br /> 11500 block to Airport Road , <br /> Design,construct street widening/improvements Totals 225 275 500 0_ 0 0 425 <br /> 14 4 3 phases In Project 31 P 0 C PE 2/12012 RTID 4,818 4,818 3,000 <br /> Principal P RW 2/1/2013 RTID 1,355 1,355 <br /> Arterial Broadway Corridor Improvements T CN 6/1/2014 RTID 27,853 27,853 <br /> South Broadway Corridor 0 <br /> SR 526 to 41st Street <br /> Widen to 5 lanes with bike lanes&sidewalks Totals 34,026 0 34,020 0 0 0 3,000 <br />