My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3025 LOMBARD AVE 2017-06-13
>
Address Records
>
LOMBARD AVE
>
3025
>
3025 LOMBARD AVE 2017-06-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 1:41:58 PM
Creation date
1/18/2017 7:59:43 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3025
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> , 4p, <br /> ,,,41b, —=‘'_ PUBLIC K/OZi K_5' Sent ui+ e-mail <br /> ' 13 <br /> July 1, 2013 <br /> Mr. Ruben Sanchez I <br /> City of Everett Facilities <br /> 3101 Cedar St <br /> Seattle, WA 98108 <br /> Project: Roofing revisions and add skylights <br /> Job Address: 3025 Lombard Ave <br /> Plan Review No: B1306-011 <br /> Dear Mr. Sanchez, <br /> In response to the application submitted, the plans have been examined and you are advised that this <br /> is an incomplete submittal for building permit. Please submit two sets of drawings with a response <br /> letter indicating how corrections are resolved on the plan set. <br /> General <br /> 1. To identify what is being proposed as new work on this permit, please revise the drawings as <br /> follows: <br /> a. New work should be indicated with dark lines. Existing work should be indicated as <br /> light lines, in comparison, and demolition work should be indicated with dashed lines. <br /> b. The drawings should be clear enough that the scope of the new work could be <br /> understood by someone other than the submitter. The skylight detail 7 on sheet A3.1 <br /> does not indicate that the skylights is new, and the plan on A3.0 does not target detail 7 <br /> for all new skylights. <br /> 2. The code analysis should include the applicable building codes, referenced at the bottom of this <br /> letter, to include the Washington State Energy Code and International Fire Code. <br /> 3. Bidding instructions and specifications prepared for bidding are not typically reviewed for <br /> building permit. <br /> Occupancy <br /> 1. The building occupancy and occupancy load should be shown on the drawings, per IBC section <br /> 2606.7. <br /> Egress <br /> 1. Floor plans should be submitted indicating the location of the replacement overhead skylights <br /> relative to egress elements, per IBC section 2606.7 (5). <br /> Construction <br /> 1. Building sections should be submitted to indicate the height of overhead skylights relative to <br /> grade level, and the building construction type should be shown on the drawings per IBC <br /> section 2608.2 (3). <br /> 2. The drawings should indicate if the building is sprinklered with an automatic fire detection <br /> C9system and the construction type, per IBC section 2609.1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.