My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/10/01 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/10/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2017 9:51:13 AM
Creation date
1/18/2017 9:49:59 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/1/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r <br /> Project:Combined Sewer Improventents"D" <br /> Change Order No. 2 <br /> Change Order Effective Date: 8/15/2003 <br /> Exhibit A—Description of Changed Work <br /> A. Items being amended or added by this change order are listed below. <br /> This change order is written as an over and under run change order. The following bid items listed have <br /> their adjusted quantity amounts shown in the attached change order estimate summary sheets. <br /> Item#4—Traffic Control Labor. Add additional hours of traffic control labor to the contract. <br /> Item#6—Sawing Pavement. Add additional lineal footage for sawing pavement to the contract. <br /> Item#7—Record Drawing. Delete record drawing item from the contract. <br /> Item#8—Removal and Replacement of Sidewalk,Curb and Gutter Type A. Reduce square yards of <br /> sidewalk,curb and gutter removed and replaced from the contract. <br /> Item#9—Unsuitable Foundation Excavation. Reduce cubic yards of unsuitable foundation excavation. <br /> Item#11—Extra Depth Manhole,Type 1,48"Diameter. Reduce extra depth for Type 1 manholes. <br /> Item#12—Side Sewer Connection and One Cleanout. Reduce number of side sewer connections. <br /> Item#13—Sanitary Sewer Pipe,8". Reduce lineal footage of 8"PVC main installed. <br /> Item#14—Sanitary Sewer Pipe,10". Increase lineal footage of 10"PVC main installed. <br /> Item#15—Sanitary Sewer Pipe,12". Increase lineal footage of 12"PVC main installed. <br /> Item#16—Sanitary Sewer Pipe,15". Reduce lineal footage of 15"PVC main installed. <br /> Item#17—Sanitary Sewer Pipe,16",Class 50 Ductile Iron. Reduce lineal footage of 16"Ductile Iron <br /> main installed. <br /> Item#18—Sanitary Sewer Pipe,18". Increase lineal footage of 18"PVC main installed. <br /> Item#19—Sanitary Sewer Pipe,18"Class 50 Ductile Iron. Increase lineal footage of 18"Ductile Iron <br /> main installed. <br /> Item#20—Additional Sewer Cleanout. Reduce number of extra side sewer cleanouts from the contract. <br /> Item#21—Storm Drain,8". Reduce lineal footage of 8"storm drain installed. • <br /> Item#22—Catch Basin,Type B. Increase the number of catch basins installed from the contract. <br /> Item#23—Gravel Borrow. Increase the tons of gravel borrow for the contract. <br /> Item#24—Crushed Surfacing Top Course. Increase the tons of Crushed Surfacing Top Course in the <br /> contract. • <br /> Item#25—Asphalt Concrete Pavement,Class B. Increase the tons of Asphalt Pavement in the contract. <br /> Item#26—Cement Concrete Pavement. Decrease the square yards of Cement Concrete Pavement in the <br /> contract. <br /> Item#27—Cement Concrete Rolled Curb and Gutter. Delete the Cement Concrete Rolled Curb and <br /> Gutter from the contract. <br /> Item#28—Street Cleaning. Increase the hours of street cleaning in the contract. <br /> Item#29—Dust Control. Decrease the million gallons of water used for dust control in the contract. <br /> Item#30—Control Density Fill. Decrease the cubic yards of control density fill used in the contract. <br /> Item#31—Pavement Patch,Temporary MC250. Decrease the tons of temporary pavement patch. <br /> Item#33—Adjust Catch Basin to Grade. Increase the number of catch basin adjustments. <br /> Item#34—Force Account. Reduce the lump sum of the force account in the contract. <br /> Item#35—Drop Manhole. Increase the number of drop manhole connections in the contract. <br /> Item#36—Extruded Asphalt Curb and Driveway Berms. Add a new item to the contract for Extruded <br /> Asphalt Curb and Berms to the contract. <br /> Item#37—Removal and Replacement of Sidewalk. Add a new item to the contract for removal and <br /> replacement of sidewalk. <br /> Item#38—Crossing of East Marine View Drive. Add a new item to the contract for the trenchless <br /> crossing of East Marine View Drive. <br /> Item#40—Equitable Adjustment to Bid Item#12. Add an item to the contract for the equitable <br /> adjustment of the unit price per side sewer connection. <br /> Item#41—CRIP Savings. Add an item to the contract for the shared savings from the trenchless crossing <br /> of East Marine View Drive. • <br /> Exhibit A <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.