Laserfiche WebLink
Washington State Department of Transportation Page 4 Six-year Transportation Improvement Program <br /> Agency Everett From 2006 to 2011 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2006) (2007) (2008) 6th Type (MM/YY) <br /> 1 2 3 4 _ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 16 5 HP-1998(015); 3 phases in project;supercedes Lowel 1 S,P 0.25 S PE 7/1/2008 RTID 1,000 1,000 1,000 <br /> Minor Neighborhood Bypass P RW 7/1/2009 RTID 800 800 800 <br /> Arterial Lenora SLBNSF Rail Line Overcrossing CN 5/1/2010 RTID 6000 6000 6000 <br /> Lenora St.and BNSF Rail Line <br /> NA <br /> Design and construct rail line overcrossing Totals 7,800 _ 7,800 1,000 6,800 <br /> 16 5 HP-1998(015) 2 phases in project 1 S,P 1.1 S PE 9/1/2007 RTID 1,000 1,000 1,000 <br /> Minor P CN 6/1/2008 RTID 6,000 6,000 2,000 4,000 EA No <br /> Arterial Lowell Neighborhood Bypass/Riverfront Parkway <br /> Lowell Neighborhood Bypass/Riverfront Parkway <br /> 41st Street to Lowell-Snohomish River Road <br /> Construct new mina arterial street Totals 7,000 7,000 1,000 2,000 4,000 <br /> 16 7 3 phases in project 4 P 0.9 C PE 1/1/2007 AIP 360 120 480 480 <br /> Minor Joint project with Sno.County-(County Lead) P RW 7/1/2008 AIP 387 129 516 516 <br /> Arterial 116th Street SE Improvements T CN 5/1/2009 AIP 2,060 744 2,804 2,804 <br /> 116th Street SE S <br /> SR 527 to 35th Avenue SE W <br /> Design,construct 3 lane street with bike&ped improv. _ G Totals 2,807 993 3,800 480 516 2804 <br /> 16 8 2 phases in project 4 P 1 C PE 2/1/2007 AIP 252 84 336 336 <br /> Minor P CN 6/1/2008 AIP 1,660 604 2,264 2,264 <br /> Arterial 100th Street SW Improvements T <br /> 100th Street SW 0 <br /> Airport Road to Evergreen Way <br /> Design,construct road widening&other improvements Totals 1,912 638 2,600 336 2,264 <br /> 16 9 3 phases in project 6 P 0.1 C PE 3/1/2009 75 75 75 <br /> Minor P RW 3/1/2010 50 50 50 <br /> Arterial Casino Rd.at Hardeson Intersec.Improv. T CN 5/1/2011 375 375 375 <br /> Casino Rd./Hardeson Rd. W <br /> Intersection of Casino/Hardeson Rd. S <br /> Design,construct intersection improvements G Totals 500 500 500 <br /> 16 10 3 phases in project 4 P 0.5 C PE 1/1/2008 RTID 1,500 1,500 1,500 <br /> Minor Sno.Co.is lead agency P RW 1/1/2009 RTID 2,000 2,000 2,000 <br /> Arterial 4th Avenue West Improvements T CN 5/12010 RTID 5,500 5,500 5,500 <br /> 4th Avenue West W <br /> 112th Street SW to 104th St.SW S <br /> Design,construct street improvements _ G Totals 9,000 9,000 1,500 7,500 <br /> 16 10 2 phases in project 6 P 2 C PE 2/1/2007 300 300 300 <br /> Minor P CN 5/1/2008 2,700 2,700 2,700 <br /> Arterial Colby Avenue Streetscape Improvements T <br /> Colby Avenue W <br /> 19th Street to 41st Street S <br /> Design,construct streetscape improvements G Totals _ _ 3,000 3,000 300 2700 <br /> 17 1 2 phases in project 32 S 1 C PE 4/1/2002 CMAQ 291 45 336 <br /> Collector P RW 9/1/2003 CMAQ 284 44 328 CE Yes <br /> Arterial Holly Drive Non-Motorized Improvements T CN 6/302005 CMAQ 325 AIP 149 462 936 936 <br /> Holly Drive Non-Motorized Improvements 0 CN STP(N) 88 88 88 6/1/2004 <br /> 100th Street SW to Airport Road CN STP(U) 1,000 1000 1000 <br /> Design and construct pedestrian/bike improvements Totals 1988 149 551 2,688 2024 <br />