|
Washington State Department of Transportation Page 3 Six-year Transportation Improvement Program
<br /> Agency Everett From 2006 to 2011
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC
<br /> Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B.Bridge No. Federal Funding Local Agency
<br /> C.Project Title RAN
<br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E.Beginning MP or road-Ending MP or road went Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F.Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2006) (2007) (2008) 6th Type (MMM')
<br /> 1 23 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 14 6 2 phases in project 12 S 00 C PE 1/1/2006 STP(S) 135 135 135 CE
<br /> Principal P CN 3/1/2007 STP(S) 765 765 765
<br /> Arterial (HES)Projects(Broadway/52nd SL;S.Broadway T
<br /> at 52nd St.&at Madison St.;entrances to Forest 0
<br /> Park on Mukilteo Boulevard)
<br /> Various safety,signal related improvements Totals 900 900 135 765
<br /> 14 7 3 phases in project 6 P 0.25 C PE 1/12009 AIP 250 250 500 500
<br /> Principal P RW 6/1/2010 AIP 500 500 1,000 1,000
<br /> Arterial Pacific Avenue/BNSF Grade Crossing Improvements T CN 6/12012 AIP 2,250 2.250 5,500 5,500
<br /> Pacific Avenue and Chestnut Street 0
<br /> N/A to N/A
<br /> Grade separation over BNSF rail line Totals 3,000 7,000 7,000
<br /> 14 8 1 phase in project 31 P 0 C PE 9/1/2006 75 75 75 75
<br /> Principal P
<br /> Arterial Rucker Avenue/W.Marine View Dr.Connection Study T
<br /> Rucker Avenue,W.Marine View Dr. 0
<br /> N/A to N/A
<br /> Study alternatives for new arterial connection Totals 75 75 75
<br /> 14 9 1 phase in project 31 P0 C PE 1112006 135 135 135
<br /> Principal P
<br /> Arterial CBD Comprehensive Transportation Plan T
<br /> Various Arterials within City's Central Business Dist 0
<br /> N/A to N/A
<br /> Study improvement needs for downtown core Totals 135 135, 135
<br /> 14 10 1 phase in project 31 P0 C PE 2/1/2005 200 200 200
<br /> Principal P
<br /> Arterial Arterial Needs Studies T
<br /> Various Arterials within City Limits 0
<br /> N/A to N/A
<br /> Study improvement needs-various classes of arterials Totals 200 200 200
<br /> 14 11 2 phases in project 31 P0 C PE 2112007 25 25 25
<br /> Principal P CN 4/12008 175 175 175
<br /> Arterial Arterial Streetscaping Improvements T
<br /> Various Arterials within City Limits 0
<br /> N/A to N/A
<br /> Streetscaping improvements-various classes of arterials Totals 200 200 25 175
<br /> 16 1 HP-1998(015) 3 phases in project 8 S 0.3 C 'PE 1/1/1999 DEMO 1,120 280 1,400 500
<br /> Minor P RW 9/30/1999 DEMO PWTF 1,000 800 1,800 EA
<br /> Arterial 41st Street Overcrossing T CN 6/30/2001 DISC 6,728 FMSIB 3,000 1,658 11,386 8,673 Yes
<br /> 41st Street o CN 6/30/2001 STP(U) 1,457 1.457
<br /> IS interchange to Landfill site S CN 6/302001 STP(E) 457 457 6/1/2001
<br /> Design and construct railway overcrossinq W Totals 93
<br /> 62 4,000, 2,738 16,500 9,173
<br /> 16 2 3 phases in project 4 S 1 C PE 1/1/2002 AIP 238 194 432
<br /> Minor P RW 5/1/2003 AIP 743 607 1,350
<br /> Arterial 112th Street SE Improvements T CN 6/30/2004 AIP 2.100 1,716 3,816 2.400
<br /> 112th Street SE 0
<br /> 3rd Avenue SE to west side IS R-O-W S
<br /> Design,construct 5 lane street with bike&ped improv. W Totals _ 3,081 2,517 5,598 2,400
<br /> 16 3 2 phases in project 4 S 1 C PE 1/1/2002 AIP 431 796 1,227 250
<br /> Minor P RW 7/1/2005 AIP 666 54 720 EA YES
<br /> Arterial 112th Street SE 1-5 bridge widening T CN 7/1/2006 AIP 4.053 4,400 8,453 3.500 3,500 3.971 6/1/2005
<br /> 112th Sheet SE 0 CU 7/12006 STP-U 2,500 2,500
<br /> 112th Street SE at Interstate 5 S
<br /> Design,construct 5 lane street with bike&ped improv. W Totals 2,500 5,150 5,250 12,900 3,750 3,500 3,971
<br /> 16 4 3 phases in project 4 S 1 C PE 1/1/2007 RTID 800 800 800
<br /> Minor P RW 3/12008 RTID 950 950 950
<br /> Arterial 112th Street SE Improvements T CN 7/1/2009 RTID 3,200 3,200 3.200
<br /> 112th Street SE 0
<br /> East side IS R-O-W to SR 527(19th Ave.SE) S 4,950 0 4,950 0 800 950 3,200
<br />
|