My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5653
>
Resolutions
>
Resolution 5653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 12:00:44 PM
Creation date
1/19/2017 12:00:17 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
5653
Date
7/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2006 To 2011 Six-year Transportation Improvement Program <br /> Interstate 2. BNSF RR safety improvements (Safety) <br /> 1. 1-5 Median HOV Lanes&Auxiliary Lanes 3. Roadway hazard elimination projects(Safety) <br /> 2. 1-5/41st Street Interchange <br /> 3. I-5/ 112th Street SE P&R,Flyer Stop,HOV Ramps 1. Annual Street Overlay Program (Maintenance) <br /> 4. I-5/Downtown Everett Interchange Improvements 2. Sidewalk repair and replacement (Maintenance) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave.) 3. Pavement marking projects (Maintenance) <br /> 5. I-5/ 100t Street SE HOV Access/Undercrossing <br /> 6. NB Everett Mall Way/SB I-5 Onramp 1. 106th Place SE Improvements (Street) <br /> 7. I-5/Smith Island Interchange 2. 3`d Avenue SE Improvements (Street) <br /> 8. I-5/East Marine View Drive Interchange Improvements 3. Pine Street Improvements (Street) <br /> 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> Freeways 5. Simpson Site Access Improvements (Street) <br /> 1. US 2 Improvements(I-5 to SR 204) <br /> 2. SR 526/Hardeson Road Interchange 1. Traffic Signal Interconnect (Traffic Signals) <br /> 2. Traffic Signal Improvements (Traffic Signals) <br /> Principal Arterials 3. ITMS Upgrades (Traffic Signals) <br /> 1. 19th Avenue SE (SR 527)Improvements <br /> 2. East Marine View Drive Improvements 1. Neighborhood Block Grants (Neighborhoods) <br /> 3. Broadway/Beverly Blvd.Intersection Improvements 2. Neighborhood Traffic Studies/Projects (Neighborhoods) <br /> 4. Evergreen Way Improvements, 115th St. SW to Airport <br /> 5. Broadway Corridor Improvements 1. City Entryway Landscaping/Signs (Landscaping) <br /> 6. HES Projects(Brdwy/52°d,Brdwy/Madison,Forest Park) <br /> 7. Pacific Avenue/BNSF Grade Crossing Improvements Non-Motorized Trail/Path Improvements <br /> 8. Rucker Ave./W.Marine View Dr.Connection Study 1. Riverfront Walkway Overcrossing <br /> 9. CBD Comprehensive Transportation Plan 2. Riverfront Walkway Phase 1 <br /> 10. Arterial Needs Study 3. 41St Street Bide-Ped.Connector <br /> 11. Arterial Streetscape Improvements(various locations) 4. Terminal Avenue Ped.Improvements <br /> 5. Henry M.Jackson Ped.Bridge <br /> Minor Arterials 6. Riverside Bus Pk.Ped.Trail <br /> 1. 40 Street Overcrossing 7. West Marine View Drive Bike-Ped Separation <br /> 2. 112th Street SE Street Improv.(3rd Ave. SE to I-5) 8. West/East Marine View Drive Bike-Ped Separation <br /> 3. 112th Street SW/I-5 Bridge Widening 9. 47th Street Ped Improvements(Evergreen to B.F.Ln.) <br /> 4. 112th Street SW-SE Street Improvements(I-5 to SR 527) 10. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 5. Lenora Street/BNSF Rail Line Overcrossing 11. Shoreline Access Imp.(Various Locations) <br /> 6. 116th Street SE Street Improvements 12. Snohomish River Bike/Ped.Bridge <br /> 7. 100th Street SW Street Improvements 13. Everett Non-motorized Projects(Various Locations in Everett) <br /> 8. Casino Rd./5`h Avenue W.Intersection Improvements <br /> 9. 4th Avenue West Improvements(104th to 112 ) Transit <br /> 10. Colby Avenue Streetscape Improvements 1. Bus Replacements-2006 to 2010 <br /> 11. Lowell Neighborhood Bypass/Riverfront Parkway 2. Bus fleet expansion <br /> 3. Regional Fare Coordination Project <br /> Collector Arterials 4. Vehicle Maintenance Capitalization <br /> 1. Holly Dr.Non-motorized Impr.(100th SW to Airport Rd) 5. Bus Cleaning Facility <br /> 2. East Everett Avenue/BNSF Overcrossing 6. Paratransit Operation <br /> 3. Holly Dr.Non-motorized Imp.(4th Ave.W.to 92°1) <br /> 4. Bond Street Ped/Bike Impr.(Kromer to Terminal) HOV Projects <br /> 5. Chestnut St./Eclipse Mill Rd.Impr.(Pacific to 36th) 1. Everett Station Bicycle Demo Project <br /> 6. Silver Lake Road-121st Street SE Ped.Improvements 2. Everett Station Commuter Rail Improvements <br /> 7. 36th St./Smith St.Ped,Bike,Landscape Improvements 3. Everett Station Park&Ride Parking Structure <br /> 8. 36 St./BNSF At-grade Rail Crossing Closure 4. North Everett Transit Center <br /> 9. 36th St./BNSF Rail Line Ped/Bike Crossing 5. Implementation of State CTR Law <br /> 10. 37th Street Improvements(Rucker to Broadway) <br /> 11. Smith Island Bike and Pedestrian Improvements Projects Shown in bold type were not included in the <br /> 12. Silver Lake Road-121 Street SE Ped.Improvements City's 2005-2010 Six-year TIP <br /> Local Access and Other Projects <br /> 1. BNSF RR track relocation (Safety) <br />
The URL can be used to link to this page
Your browser does not support the video tag.