|
CITY OF EVERETT 2006 TO 2011 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIO- PE R/W CONST. Est.2006-11 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 1 Interstate 1 1-5 Median HOV Lanes&Auxiliary Lanes SR 526 to US 2 Jan.99 Nov.04 May.05 230,000,000 WSDOT 1
<br /> 2 Interstate 2 1-5-41st Street Interchange 41st Street to US 2 Jul.03 Jan.06 Jul.07 49,000,000 EVERETT 2
<br /> 3 Interstate 3 I-5 112th Street SE Direct Access HOV/PNR/Flyer Stops 1-5 at 112th Street SE Jan.02 Jul.05 Jul.06 22,600,000 ST&WSDOT 3
<br /> 4 Interstate 4 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Ayes.,and US 2 Jan.08 Jun.10 Sep.11 44,500,000 • EVERETT 4
<br /> 5 Interstate 5 1-5/100th Street SE HOV access/undercrossing 1-5 at 100th Street SE Jul.09 Jan.10 Jan.11 57,000,000 • EVERETT 5
<br /> 6 Interstate 6 _NB Everett Mall Way to SB 1-5 Onramp Everett Mall Way to 1-5 Jul.09 Jan.10 Jan.12 12,000,000 * WSDOT 6
<br /> 7 Interstate 7 1-5/Smith Island interchange 12th Ave.NE or north of 12th Ave. Jan.09 Jun.10 Jul.11 25,000,000 ' EVERETT 7
<br /> 8 Interstate 8 1-5/East Marine View Drive Interchange 1-5 at East Marine View Drive Jan.09 Jun.10 Jun.12 35,000,000 * EVERETT 8
<br /> 9 Freeway 1 US 2 Improvements 1-5 to SR 204 Jun.09 Jun.10 Jun.12 323,000,000 • WSDOT 9
<br /> 10 Freeway 2 SR 526/Hardeson Road Interchange _SR 526/Hardeson Road Jun.09 Jun.10 Jun.12 38,000,000 • WSDOT 10
<br /> 11 Principal Arterial 1 19th Avenue SE(SR 527)Improvements 110th Street SE to 132nd Street SE Mar.94 Jul.98 Jun.04 3,000,000 WSDOT 11
<br /> 12 Principal Arterial 2 East Marine View Drive Improvements North Broadway to Interstate 5 Mar.03 Jul.05 Mar.06 10,400,000 • EVERETT 12
<br /> 13 Principal Arterial 3 Broadway/Beverly Blvd.Intersection Impr. So.Broadway at Beverly Blvd. Oct.04 Jun.06 750,000 EVERETT 13
<br /> 14 Principal Arterial 4 Evergreen Way Improvements,115th to Airport Road 11500 block to Airport Road Jan.09 Jul.10 500,000 • EVERETT 14
<br /> 15 Principal Arterial 5 Broadway Corridor Improvements SR 526 to 41st Street Feb.12 Feb.13 Jun.14 33,274,000 ' EVERETT 15
<br /> 16 Principal Arterial _ 6 HES Projects(Brdwy at 52nd&at Madison,Forest Pk entrances) Ev.Mall Wy.,Broadway,Colby Ave. Jan.06 Mar.07 900,000 ' EVERETT
<br /> 17 Principal Arterial 7 Pacific Avenue/BNSF Grade Crossing Improvements Pacific Avenue and Chestnut St. Jan.09 Jun.10 Jun.12 7,000,000 • EVERETT 16
<br /> 18 Principal Arterial 8 Rucker AveJW.Marine View Dr.Connection Study Pacific Ave.and Wall Ave. Sep.06 75,000 • EVERETT 17
<br /> 19 Principal Arterial 9 CBD Comprehensive Transportation Plan Downtown Central Business Dist Jan.06 135,000 • EVERETT 18
<br /> 20 Principal Arterial 10 Arterial Needs Study Various arterials within city limits Feb.05 200,000 • EVERETT
<br /> 21 Principal Arterial 11 Arterial Streetscaping Improvements Various arterials within city limits Feb.07 Apr.08 400,000 ' EVERETT
<br /> 22 Minor Arterial 1 41st Street Overcrossing 41st Street at So.3rd Avenue Jan.99 Sep.99 Jun.01 9,200,000 EVERETT 19
<br /> 23 Minor Arterial 2 112th Street SE Improvements 3rd Avenue SE to Interstate 5 Jun.03 Sep.03 Jun.04 4,200,000 EVERETT 20
<br /> 24 Minor Arterial 3 112th Street SE 1-5 Bridge Widening 112th Street at Interstate 5 Jan.01 Sep.02 Apr.06 9,800,000 EVERETT 21
<br /> 25 Minor Arterial _ 4 112th Street SE Improvements Interstate 5 to 19th Avenue SE Jan.07 Mar.08 Jul.09 4,950,000 " EVERETT 22
<br /> 26 Minor Arterial 5 Lenora StJBNSF Rail Line Overcrossing Lenora St.&Lowell Sno.River Rd. Jul.08 Jul.09 May.10 7,800,000 • EVERETT 23
<br /> 27 Minor Arterial 6 116th Street SE Improvements SR 527 to 35th Avenue SE Jan.07 Jul.08 May.09 3,800,000 EVERETT 24
<br /> 28 Minor Arterial 7 100th Street SW Improvements Airport Road to Evergreen Way Feb.07 Jun.08 2,600,000 • EVERETT 25
<br /> 29 Minor Arterial 8 Casino Road at 5th Ave.W.Road Intersection Improvements Casino Road at Hardeson Road Mar.09_ Mar.10 May.11 500,000 * EVERETT 26
<br /> 30 Minor Arterial 9 4th Avenue West widening and improvement 104th Street to 112th St.SW Jan.08 Jan.09 May.10 9,000,000 • SNO.CNTY. 27
<br /> 31 Minor Arterial 10 Colby Avenue Streetscape Improvements 19th Street to 41st Street Feb.07 May.09 3,000,000 • EVERETT 28
<br /> 31 Minor Arterial 11 Lowell Neighborhood Bypass/Riverfront Parkway Lowell/Snohomish River RdJ41st Overcrossing Jul.08 Jul.09 May.10 5,200,000 • EVERETT 29
<br /> 32 Collector Arterial 1 Holly Drive Non-Motorized Improvements 100th Street SW to Airport Road Apr.02 Sep.03 Jun.05 2,688,000 EVERETT 30
<br /> 33 Collector Arterial 2 East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. _ Jan.09 Sep.09 Jun.10 10,000,000 • EVERETT 31
<br /> 34 Collector Arterial 3 Holly Drive Non-Motorized Improvements 4th Avenue W.to 92nd Street Jan.07 Sep.07 Jun.08 1,000,000 • EVERETT 32
<br /> 35 Collector Arterial 4 Bond Street Ped/Bike Improvements Kromer to Teminal Ave. Jun.03 Jan.04 Jul.06 250,000 EVERETT 33
<br /> 36 Collector Arterial _ 5 Chestnut StJEclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.07 Jun.08 1,200,000 • EVERETT 34
<br /> 37 Collector Arterial 6 36th Street/Smith Street Ped,Bike&Lndscp.Improv. Broadway to Eclipse Mill Rd.:36th to 33rd Jan.07 May.08 May.09 1,000,000 • EVERETT 35
<br /> 38 Collector Arterial 7 36th Street/BNSF At-grade Rail Crossing Closure 36th St.&BNSF Rail Line _Jan.07 Sep.07 Jun.08 200,000 • EVERETT 36
<br /> 39 Collector Arterial 8 36th Street/BNSF Rail Line Ped/Bike Crossing 36th St.&BNSF Rail Line Jan.08 Sep.08 Jul.09 500,000 • EVERETT 37
<br /> 40 Collector Arterial 9 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.07 Jun.08 500,000 * EVERETT 38
<br /> 41 Collector Arterial 10 Smith Island Bike/Ped improvements Various arterials on Smith Island Jan.07 Jan.08 May.09_ 1,000,000 ' EVERETT 39
<br /> 42 Collector Arterial 11 Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 Jun.07 Jun.08 Jul.09 500,000 • EVERETT 40
<br /> 971,622,000
<br /> * A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type were not included in the 2005-2010 Six-Year TIP.
<br />
|