Laserfiche WebLink
CITY OF EVERETT 2006 TO 2011 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Project PROJECT PRIO- PE RIW CONST. Est.2006-11 LEAD MAP <br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> 43 Local Access-SAF 1 BNSF RR track relocation Pacific Avenue to Lowell Junction Jan.02 Dec.05 Jun.06 6,500,000 EVERETT 41 <br /> 44 Local Access-SAF 2 BNSF RR safety improvements Various railroad crossings in Everett Jan.06 Jun.06 550,000 * EVERETT <br /> 45 Local Access-SAF 3 Roadway Hazard Elimination Projects Various locations within city limits Jul.06 120,000 • EVERETT <br /> 46 Local Access-PRIM 1 Annual Street Overlay Program Various streets within city limits Jan.06 Jul.06 6,000,000 EVERETT <br /> 47 Local Access-PRIM 2 Sidewalk repair and replacement Various locations within city limits Jan.06 , May.06 360,000 EVERETT <br /> 48 Local Access-PRIM 3 Pavement Marking Project Various locations within city limits Jan.06 May.06 210,000 EVERETT <br /> 49 Local Arrac'STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Nov.06 Jun.07 650,000 ' EVERETT 42 <br /> 50 Local ArreccSTR 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.08 Apr.09 675,000 • EVERETT 43 <br /> 51 Local AccessSTR 3 Pine Street Improvements Everett Avenue to Hewitt Avenue Jul.09 May.10 580,000 * EVERETT 44 <br /> 52 Local AconssSTR 4 Upper&Lower Ridge Rd.Str.Improv. 74th Street to 78th Street Aug.09 Jun.10 300,000 • EVERETT 45 <br /> 53 Local Access-STR 5 Simpson Site Access Improvements Simpson Site,Snohomish Rh/affront Aug.06 Jun.07 2,000,000 • EVERETT 46 <br /> 54 Local Across-SIG 1 Traffic Signal Interconnect Various locations within city limits May.06 240,000 EVERETT <br /> 55 Local Access-SIG 2 Traffic Signal Improvements Various locations within city limits Jan.06 Jun.06 900,000 EVERETT <br /> 56 Local Access-SIG 3 ITMS Upgrades Various signals in Everett Jan.07 Apr.08 1,600,000 • EVERETT <br /> 57 Local Access-NEI 1 Neighborhood Block Grants Various locations within city limits Jan.06 May.06 360,000 • EVERETT <br /> 58 Local Access-NEI 2 Neighb.Traffic Mitig.Studies&Projects Various locations within city limits Jan.07 May.08 2,400,000 • EVERETT <br /> 59 Local Access-LS 1 City Entryway Landscaping and Signs Various entry corridors into the City Mar.06 Jul.06 180,000 • EVERETT <br /> 60 Local Access-NM 1 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Jan.99 May.07 500,000 EVERETT <br /> 61 Local Access-NM 2 Riverfront Walkway Phase 1 Lenora Street to Pacific Avenue Jan.99 May.07 55,000 EVERETT <br /> 62 Local Access-NM 3 41st Street Bike-Ped.Connector Interurban Trail to Riverfront Walkway Jan.07 Dec.08 1,700,000 * EVERETT 47 <br /> 63 Local Access-NM 4 Terminal Ave.Ped.Improvements Califomia Street to Bond Street Jun.02 Aug.04 110,000 P.O.E. 47 <br /> 64 Local Access-NM 5 Henry Jackson Park Ped Bridge E.Marine View Drive to Riverside Bus.Park Jan.06 May.07 Jul.08 2,700,000 • EVERETT 49 <br /> 65 Local Access-NM 6 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.06_ Apr.07 700,000 • EVERETT 50 <br /> 66 Local Access-NM 7 West Marine View Drive Bike-Ped Separation 22nd Street to Califomia Street Overcrossing Apr.07 Apr.08 150,000 • EVERETT 51 <br /> 67 Local Access-NM 8 West/East Marine View Drive Bike-Ped Separation Alverson Bridge to North Broadway Apr.07 Apr.08 250,000 * EVERETT 52 <br /> 68 Local Access-NM _ 9 47th Street Pedestrian Improvements Evergreen Way to Black Forest Lane Jan.08 Jun.09 500,000 • EVERETT 53 <br /> 69 Local Access-NM 10 Pigeon Creek No.1/BNSF Crossing Port of Everett Public Access Walkway to Pigeon Crk Rd Jan.07 Jul.08 Apr.09 425,000 ' EVERETT 54 <br /> 70 Local Access-NM 11 Shoreline Access Improvements Various locations within city limits Apr.06 Apr.07 6,000,000 • EVERETT <br /> 71 Local Access-NM 12 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Smith Island Nov.01 Apr.09 9,000,000 • EVERETT 55 <br /> 72 Local Access-NM 13 Everett Non-Motorized Projects'• Various locations within city limits May.05 Sep.06 1,300,000 • EVERETT <br /> **Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 47,015,000 <br /> Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW, <br /> 93rd Street SW,Dom Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,Cady Road, <br /> Fleming Street,75th Street,100th Street SW,and various shoreline public access projects <br /> *A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2004-2009 Six-year TIP. <br /> Local Access Codes: SAF=Safety; PRIM=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement; <br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement <br />