Laserfiche WebLink
" - Z <br /> ***** MAINTAIN PROPRIETARY CONFIDENTIALITY ***** <br /> THE B. N. S. F. RAILWAY COMPANY <br /> FHPM ESTIMATE FOR <br /> CITY OF EVERETT <br /> LOCATION - EVERETT DETAILS OF ESTIMATE <br /> PURPOSE, JUSTIFICATION AND DESCRIPTION <br /> SIGNAL COST TO REMOVE CROSSING WARNING DEVICES AT 36TH ST DOT 0845995 IN EVERETT, WA L/S <br /> 0037 MP 1782.36 ON THE PACIFIC DIV SCENIC SUBDIV <br /> THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTIVE PACKAGES USED FOR ESTIMATING PURPOSE <br /> ONLY. <br /> THEY CAN BE EXPECTED TO CHANGE AFTER THE ENGINEERING PROCESS. DETAILED AND ACCURATE <br /> MATERIAL LISTS WILL BE FURNISHED WHEN ENGINEERING IS COMPLETED. <br /> CONTINUING CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF <br /> RAILROAD. <br /> THIS ESTIMATE IS GOOD FOR 90 DAYS. THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST <br /> FOR LABOR, MATERIAL, AND OVERHEAD. <br /> ******************************* SIGNAL WORK ONLY ******************************* <br /> THE CITY OF EVERETT IS FUNDING THIS PROJECT. 100% OF BNSF'S COST IS AT THE STATES EXPENSE. <br /> MAINTAIN PROPRIETARY CONFIDENTIALITY <br /> DESCRIPTION QUANTITY U/M COST TOTAL $ <br /> ********** <br /> LABOR <br /> ********** <br /> ELECTRICAL LABOR F/SIGNAL EQUIPMENT 8.00 MH 169 <br /> SIGNAL FIELD LABOR 64.00 MH 1,446 <br /> PAYROLL ASSOCIATED COSTS 1,086 <br /> EQUIPMENT EXPENSES 348 <br /> SUPERVISION EXPENSES 833 <br /> INSURANCE EXPENSES 254 <br /> TOTAL LABOR COST 4,136 4,136 <br /> ********** <br /> MATERIAL <br /> TOTAL MATERIAL COST 0 0 <br /> ********** <br /> OTHER <br /> ********** <br /> CONTRACT ENGR. 1.00 EA N 2,000 <br /> EQUIPMENT RENTAL 1.00 EA N 1,000 <br /> TOTAL OTHER ITEMS COST 3,000 3,000 <br /> PROJECT SUBTOTAL 7,136 <br /> CONTINGENCIES 713 <br /> BILL PREPARATION FEE 40 <br /> GROSS PROJECT COST 7,889 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 7,889 <br /> EXE\Q\r \ <br /> 18 <br />