Laserfiche WebLink
2 <br /> 1 <br /> MAINTAIN PROPRIETARY CONFIDENTIALITY <br /> THE B. N. S. F. RAILWAY COMPANY <br /> FHPM ESTIMATE FOR <br /> CITY OF EVERETT <br /> LOCATION:- PA JUNCTION DETAILS OF ESTIMATE PLAN ITEM: 000076579 VERSION: 1 <br /> PURPOSE, JUSTIFICATION AND DESCRIPTION <br /> EVERETT,WA. - 36 TH STREET - INSTALL TRACK PROTECTION FOR BRIDGES OVER THREE TRACKS - LS <br /> 37 - MP 1782.00 <br /> CITY OF EVERETT CONTRACTOR WILL SUPPLY ALL OF THE PLANK MATERIAL TO COMPLETE THE PROJECT. <br /> BNSF RAILWAY FORCES WILL INSTALL 330-FT OF TRACK PROTECTION AND REMOVE WHEN PROJECT HAS <br /> BEEN COMPLETED. <br /> DESCRIPTION QUANTITY U/M COST TOTAL $ <br /> LABOR <br /> PLACE TEMP CROSSING 366.24 MH 6,764 <br /> REMOVE TEMP CROSSING 183.12 MH 3,382 <br /> PAYROLL ASSOCIATED COSTS 5,623 <br /> EQUIPMENT EXPENSES 4,212 <br /> DA LABOR OVERHEADS 6,357 <br /> INSURANCE EXPENSES 1,599 <br /> TOTAL LABOR COST 27,937 27,937 <br /> MATERIAL <br /> SPIKE, TIMBER SCREW, 5/8X12 IN, F/ROAD XING 1155.00 EA 1,167 <br /> MATERIAL HANDLING 28 <br /> USE TAX 77 <br /> OFFLINE TRANSPORTATION 14 <br /> TOTAL MATERIAL COST 1,286 1,286 <br /> OTHER <br /> TOTAL OTHER ITEMS COST 0 0 <br /> PROJECT SUBTOTAL 29,223 <br /> CONTINGENCIES • 1,991 <br /> BILL PREPARATION FEE 157 <br /> GROSS PROJECT COST 31,371 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 31,371 <br /> 19 <br />