Laserfiche WebLink
. . 2 <br /> 1 <br /> MAINTAIN PROPRIETARY CONFIDENTIALITY <br /> THE B. N. S. F. RAILWAY COMPANY <br /> FHPM ESTIMATE FOR <br /> CITY OF EVERETT <br /> LOCATION:- PA JUNCTION DETAILS OF ESTIMATE PLAN ITEM: 000076583 VERSION: 1 <br /> PURPOSE, JUSTIFICATION AND DESCRIPTION <br /> EVERETT,WA. - 36 TH STREET - DOT 084599S - REMOVE CONCRETE CROSSING SURFACE - LS 37 - MP <br /> 1782.36 - BELLINGHAM SUB - NORTHWEST NORTH DIVIN. - ROADMASTER JEFF STROP - 100% BILLABLE <br /> TO THE CITY OF EVERETT <br /> REMOVE 2 EACH - 42-FT OF CONCRETE CROSSING SURFACES ON MAINLINE AND SIDING AT 100$CITY OF <br /> EVERETT EXPENSE. <br /> CITY WILL BE RESPONSIBLE FOR THE ASPHALT REMOVAL AND BARRICADE PLACEMENT. <br /> A NEW BRIDGE WILL BE CONSTRUCTED AT 41ST STREET TO REPLACE THIS CROSSING. <br /> DESCRIPTION QUANTITY U/M COST TOTAL $ <br /> LABOR <br /> REMOVE PUBLIC CROSSING 52.32 MH 967 <br /> PAYROLL ASSOCIATED COSTS 536 <br /> EQUIPMENT EXPENSES 173 <br /> DA LABOR OVERHEADS 605 <br /> INSURANCE EXPENSES 152 <br /> TOTAL LABOR COST 2,433 2,433 <br /> MATERIAL <br /> TOTAL MATERIAL COST 0 0 <br /> OTHER <br /> TOTAL OTHER ITEMS COST 0 0 <br /> PROJECT SUBTOTAL 2,433 <br /> CONTINGENCIES 0 <br /> BILL PREPARATION FEE 13 <br /> GROSS PROJECT COST 2,446 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 2,446 <br /> �XN\a\1 <br /> 20 <br />