Laserfiche WebLink
5 <br /> Exhibit "A-1" <br /> Scope of Services <br /> City of Everett <br /> East Marine View Drive <br /> PHASE II: Surveying, Basemapping, Design Report & Environmental <br /> Documentation <br /> INTRODUCTION <br /> This project involves the development of corridor improvements along East Marine View Drive, <br /> from the northbound I-5 off ramp to the SR 529-Broadway Ave on/off ramp within the City of <br /> Everett. These improvements will include roadway enhancements and non-motorized trail <br /> facilities to connect similar facilities to the south and north of the project area. The roadway <br /> improvements will include a new travel lane configuration, adjustments to the horizontal <br /> alignment, intersection improvements, new traffic signals,pedestrian facilities and landscaping. In <br /> conjunction with the roadway improvements, a new stormwater conveyance system will also be <br /> constructed. Surface water runoff will be conveyed to the City of Everett's CSO system. <br /> GENERAL SCOPE OF SERVICES <br /> This agreement includes professional services to provide alternative analysis, community <br /> involvement and preliminary design for East Marine View Drive. To allow flexibility the services <br /> under this agreement will be accomplished as the first of three overall phases of the project's <br /> development: <br /> Phase I—Alternative Analysis &Preliminary Engineering Services <br /> Phase II—Surveying, Basemapping, Design Report &Environmental Documentation <br /> Phase III - PS&E Services <br /> Phase IV - Construction Observation & Administration Services <br /> Federal funds will be used in the planning, design, and/or construction of the project. Accordingly, <br /> the procedures outlined in the Local Agency Guidelines (LAG manual)will be used during <br /> development of the project. The following is a description of services to be provided by Perteet <br /> Engineering, Inc. and subconsultants for Phase II. <br /> Page 2 of 1 1 <br /> 8 <br />