My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 9:29:12 AM
Creation date
1/20/2017 9:28:52 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> SECTION IV: PROJECT NEED <br /> 4) Perform Hydraulic Analysis and Identify Deficiencies <br /> a) Milestones: Start: 5/9/2003 Finish: 7/3/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum listing the results of the final collection system hydraulic model with all the <br /> recommended CIP projects. <br /> 5) Establish Facility Cost Criteria <br /> a) Milestones: Start: 7/4/2003 Finish: 7/21/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum on proposed unit costs and cost allowances for construction of sewers and <br /> lift stations. <br /> 6) Sewer System Assessment <br /> a) Milestones: Start: 5/19/2003 Finish: 7/14/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum presenting lift stations assessment procedures, summary of condition <br /> assessment review,data collection and use strategies, and recommendations for the operation and maintenance <br /> program. <br /> 7) Reclamation Evaluation <br /> a) Milestones: Start: 10/27/2003 Finish: 11/14/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum summarizing the reclamation evaluation for inclusion in the <br /> Comprehensive Sewer Plan. <br /> 8) Wastewater Treatment Evaluation <br /> a) Milestones: Start: 4/2/2003 Finish: 4/8/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum summarizing the wastewater treatment evaluation for inclusion in the <br /> Comprehensive Sewer Plan. <br /> 9) CSO Management <br /> a) Milestones: Start: 10/6/2003 Finish: 10/31/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum on CSO management for inclusion in the Comprehensive Sewer Plan. <br /> 10) Develop Basin Plans <br /> a) Milestones: Start: 7/4/2003 Finish: 10/2/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Prepare the Final Basin Plan Notebook,which will include: GIS maps and conceptual plans of <br /> recommended trunk sewer projects; quantity estimates for use in cost analyses;and opinions of probable <br /> construction cost. <br /> 11) Develop Prioritized Capital Improvement Program (CIP) <br /> a) Milestones: Start: 11/17/2003 Finish: 12/19/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Final CIP technical memorandum including spreadsheet and schedule for use in the financial <br /> analysis. <br /> 12) Evaluate Financing Policies and Alternatives <br /> a) Milestones: Start: 2/2/2003 Finish: 3/5/2003 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Technical memorandum will include the City's financial policies, alternative funding strategies,a <br /> summary of funding recommendations, and potential revenue requirement impacts of the proposed CIP projects. <br /> 13) Review and Coordinate Capacity,Management,Operation and Maintenance(CMOM)Requirements <br /> a) Milestones: Start: 1/12/2004 Finish: 2/6/2004 17 <br /> b) Participants: Everett's Public Works staff and Consultant <br /> c) Work Product: Needs assessment summary technical memorandum with schedule for CMOM compliance. <br /> PWTF Planning Loan 6 Application Forms <br />
The URL can be used to link to this page
Your browser does not support the video tag.