Project: 5 <br /> Change Order no. <br /> Change Order Effective Date: <br /> The following are descriptions of the type of work that was completed and paid for under bid item#49. <br /> Relocate or repair existing private sprinkler systems along the project. <br /> Relocation of existing business signs. <br /> Payment to make modifications to existing landings and steps in order to match surrounding grades. <br /> Remove and relocate existing shrubs and plants along the project to back of right-of-way. <br /> Modifications to existing concrete structures to accommodate new surrounding grades. <br /> Prep and restore along the entire project those locations that require installation of topsoil,sod or bark <br /> mulch. <br /> Perform various private improvement restorations as deemed necessary by the onsite engineer. <br /> A completed summary list of the various force account sheets is available upon request. <br /> Item#51—Cement Concrete Sidewalk. The City added additional square yards of cement concrete <br /> sidewalk to the contract work. <br /> Item#52—Cement Concrete Driveway. The City added additional square yards of cement concrete <br /> driveway to the contract work. <br /> Item#70—Additions& Modifications to the Contract. Many work related issues occurred during <br /> construction of this project in which the plans and specifications were silent as to the mechanism for <br /> payment of said work. This bid item is being created to address these unforeseen and design omission <br /> situations. $130,000.00 is being added to the contract to cover this work effort. All work is not yet <br /> complete and additional dollars may be needed prior to project completion. Currently the cost total <br /> approximately$121,544.00. <br /> Where possible lump sum agreements were arrived upon and work change directives were written and <br /> signed documenting the agreed lump sum cost for said additional work. See list of described work change <br /> directives below. <br /> Where lump sum costs could not be agreed upon the additional work was done and tracked on a force <br /> account basis. <br /> The work change directives written cover the following additions and modifications to the contract. <br /> • Payment for use of portable message sign boards at the beginning of the project to encourage the <br /> traveling public to use alternative routes and warning the traveling public about upcoming street <br /> paving operations. <br /> • Payment for installation of open for business signs for private businesses along Evergreen Way. <br /> • Payment for making modifications to the type of curb ramps called out for in the plans to meet the <br /> new City of Everett Standards. <br /> • Payment for additional costs in saw cutting and removal of extra thick roadway section. The <br /> specifications and bid proposal identified the existing roadway as being an asphalt roadway <br /> section when in actuality it was a concrete roadway overlaid with asphalt pavement. <br /> • Payment for the potholing of the existing Qwest duct bank system along the location where the <br /> structural CIP wall was to be built. <br /> • Payment for the additional overtime labor rate costs to complete work on a Saturday. The local <br /> businesses agreed this approach would minimize construction impacts to them in the 4400 block <br /> of Rucker Avenue. <br /> • Payment to pump out,remove and environmentally dispose of two each fuel oil tanks encountered <br /> during roadway widening excavation exercises. Removal of these tanks was required per Everett <br /> Fire Department Code. <br /> Exhibit A 1 7 <br /> Page8ofll <br />