Laserfiche WebLink
3 <br /> King County Bid Equipment: <br /> Base Loader $89,290.00 <br /> Third Function Hydraulics $1,100.00 <br /> 17.5-25 Radial Tires $818.00 <br /> Dual Batteries $84.00 <br /> Engine Air Heater $177.00 <br /> AM/FM Radio $315.00 <br /> Front Fenders $347.00 <br /> Rear Fenders $506.00 <br /> Optional Counterweight $1,065.00 <br /> Front and Rear Work Lights $166.00 <br /> Standard Differentials $0.00 <br /> JRB Coupler $2,600.00 <br /> 2.5 GP Bucket $3,146.00 <br /> (6-yr/3500-hr Warranty Included in Bid) $2,600.00 <br /> Options Added By King County at Award: <br /> Front Differential Lock $100.00 <br /> Four Wheels Over 7-Units $720.01 <br /> Total From King County Bid $103,034.01 <br /> City of Everett Options: <br /> City Warranty and Support Requirements $204.00 <br /> Delete Air Intake Heater -$177.00 <br /> Either Start $117.00 <br /> Return to Carry $365.00 <br /> Standard 20.5-25 L3 Bias Tires -$818.00 <br /> Spare Wheel -$720.01 <br /> Ride Control $1,850.00 <br /> Delete Third Function Hydraulics -$1,100.00 <br /> Delete JRB Coupler -$2,600.00 <br /> Delete 6-YR/3500-HR Warranty to Standard -$2,600.00 <br /> 3-YD G.P. Bucket in lieu of 2.5-YD G.P. $0.00 <br /> Total Option Changes -$5,479.01 <br /> New Total $97,555.00 <br /> Less Trade-In of#3600 -$17,500.00 <br /> Net Total $80,055.00 <br /> Sales Tax @8.9% $7,124.90 <br /> Grand Total $87,179.90 <br /> 2003 Budget: $88,172.00 <br /> -$992.10 <br /> Under Budget <br /> (Plus In-service Costs) <br />