My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/10/29 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/10/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 11:17:09 AM
Creation date
1/20/2017 11:16:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/29/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ull I or tVtKL1 1 <br /> 2 FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Rinker Materials ADDRESS: P 0 Box 2037 <br /> CITY: Everett STATE: WA 98203 DATE: September 23, 2003 <br /> PROJECT TITLE: 2003 Asphalt Concrete Overlay WORK ORDER NO. 3125 <br /> DATE WORK COMPLETE: September 23,2003 FINAL AMOUNT: $766,310.81 <br /> CONTRACTOR'S CER!'INCATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I may have, arising out of the performance of said contract,which are not set forth in said estimate. <br /> x (ak ' m x - <br /> CONTRACTORS TITLE <br /> Rinker Materials NO40 <br /> s i. <br /> Subscribe nd sworn t be or c Q <br /> � ;N `nA. <br /> mes I day o 11t, Z o U 3 6 0 <br /> X Notary Public N o o a O <br /> in and for e State of Washington,residing at L s ? <br /> .. VO3 d' <br /> dbW <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: to^� <br /> estimate to bje based upon actual <br /> measure a eats and to true and correct. <br /> X x —_) <br /> r <br /> Cons ction Manager Utilities Director <br /> Terry Henke Tom Thetford <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.